logo

Adaptation GFFF-V Lower Austria to meet requirements of EC

Sector: Telecommunications • Location: Austria

Source: EU Funding & Tenders Portal

Project
Ongoing

In order to be able to successfully certify the GFFF-V module in the ECPP and at the same time to be able to meet the increased or new requirements in the UCPM, sustainable adaptations are necessary, especially in the area of logistics. Mobile Command Post - further development of existing systems - digitization (satellite connection, location of emergency services in the operational area, ...) -

Project Information FAQ

Project Information

3 Q
The project “Adaptation GFFF-V Lower Austria to meet requirements of EC” is an infrastructure initiative in the Telecommunications sector, located in Austria. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In order to be able to successfully certify the GFFF-V module in the ECPP and at the same time to be able to meet the increased or new requirements in the UCPM, sustainable adaptations are necessary, especially in the area of logistics. Mobile Command Post - further development of existing systems - digitization (satellite connection, location of emergency services in the operational area, ...) - video surveillance BoO - operations planning in coordination with organizations for people with disabilities (using VTC) - battery instead of mains backup operation, smaller power required for generator set Field Kitchen - (smaller) alternative to existing systems - grocery purchases on site - means short transport routes, less waste, less energy for cooling - otherwise ready-made meals from Austria - supply area in particular poses major logistical challenges in the course of mobilization interchangeable loading body sanitary (shower & toilet combined) - reduction of number of swap bodies - gender separation - showers & toilets barrier-free - also for the use by affected populations or other emergency organizations interchangeable loading body hygiene (cleaning and drying of uniforms) - additional condition for GFFF-V for use abroad - operations of the GFFF-V module in NMK 2021 and FR 2022 have shown the need for replacement uniforms (hygiene & health) - instead of replacement uniforms being regularly delivered in accordance with our processes, cleaning on site is now being considered - including waste separation system and, if necessary, transport of waste back to Austria and delivery for professional recycling - also for the use by affected populations or other emergency organizations VHF radios - communication in the affected country if VHFs normally used cannot be used

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data