logo
ProjectComplete

ADAPTIVE TRAFFIC CONTROL SYSTEM

The status, timeline and source of this project. A free account opens every field.

Source: Georgia Department of Transportation (GDOT)

The proposed project consists of the installation of an Adaptive Traffic Signal System primarily along US 41/Cobb Parkway from the Bartow County line to Barrett Parkway, Chastain Road from US 41/Cobb Parkway to Interstate 575 (I-575), and Barrett Parkway from US 41/Cobb Parkway to I-575, as well as several surrounding roads, in Cobb County. The upgrade consists of the replacement of traffic signal

Status
Closed
Sector
Broadband, Power Transmission, Road, Telecommunications, Government, Power Generation (CCGT), Manufacturing (Industrial)
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about ADAPTIVE TRAFFIC CONTROL SYSTEM

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “ADAPTIVE TRAFFIC CONTROL SYSTEM” is an infrastructure initiative in the Broadband sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project consists of the installation of an Adaptive Traffic Signal System primarily along US 41/Cobb Parkway from the Bartow County line to Barrett Parkway, Chastain Road from US 41/Cobb Parkway to Interstate 575 (I-575), and Barrett Parkway from US 41/Cobb Parkway to I-575, as well as several surrounding roads, in Cobb County. The upgrade consists of the replacement of traffic signal controllers within existing signal cabinets, installation of vehicular detection cameras at existing traffic signals, and some installation of additional fiber optic cable on existing utility poles. All work would be aerial using existing signal installations and existing utility poles. No ground disturbance would occur for this project, and all work would be conducted within the existing rights-of-way of the roadways.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Broadband, Power Transmission, Road, Telecommunications, Government, Power Generation (CCGT), Manufacturing (Industrial)

Article published date

2024-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project