ADAPTIVE TRAFFIC CONTROL SYSTEM
The status, timeline and source of this project. A free account opens every field.
Source: Georgia Department of Transportation (GDOT)
The proposed project consists of the installation of an Adaptive Traffic Signal System primarily along US 41/Cobb Parkway from the Bartow County line to Barrett Parkway, Chastain Road from US 41/Cobb Parkway to Interstate 575 (I-575), and Barrett Parkway from US 41/Cobb Parkway to I-575, as well as several surrounding roads, in Cobb County. The upgrade consists of the replacement of traffic signal
- Status
- Closed
- Sector
- Broadband, Power Transmission, Road, Telecommunications, Government, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about ADAPTIVE TRAFFIC CONTROL SYSTEM
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project consists of the installation of an Adaptive Traffic Signal System primarily along US 41/Cobb Parkway from the Bartow County line to Barrett Parkway, Chastain Road from US 41/Cobb Parkway to Interstate 575 (I-575), and Barrett Parkway from US 41/Cobb Parkway to I-575, as well as several surrounding roads, in Cobb County. The upgrade consists of the replacement of traffic signal controllers within existing signal cabinets, installation of vehicular detection cameras at existing traffic signals, and some installation of additional fiber optic cable on existing utility poles. All work would be aerial using existing signal installations and existing utility poles. No ground disturbance would occur for this project, and all work would be conducted within the existing rights-of-way of the roadways. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Broadband, Power Transmission, Road, Telecommunications, Government, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
