Adares Wind Farm
Sector: Wind • Location: Turkey
Source: World Bank Group
Gestamp Eolica was developing the 10MW Adares wind farm, in Turkey. The project was developed in joint-venture with Faik Celik. The wind farm was located in Selcuk, Izmir province.
The turbines were supplied by Gestamp (G90-2.0MW).
The project reached financial closure in December 2013, with Garanti Bank. Total project cost was $19.5 million. The debt/equity ratio was 79/21, after a loan of $15.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Gestamp Eolica was developing the 10MW Adares wind farm, in Turkey. The project was developed in joint-venture with Faik Celik. The wind farm was located in Selcuk, Izmir province. The turbines were supplied by Gestamp (G90-2.0MW). The project reached financial closure in December 2013, with Garanti Bank. Total project cost was $19.5 million. The debt/equity ratio was 79/21, after a loan of $15.4 million was extended to the project company. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
