Adares Wind Farm
Active · Turkey
Source: World Bank Group
Gestamp Eolica was developing the 10MW Adares wind farm, in Turkey. The project was developed in joint-venture with Faik Celik. The wind farm was located in Selcuk, Izmir province.
The turbines were supplied by Gestamp (G90-2.0MW).
The project reached financial closure in December 2013, with Garanti Bank. Total project cost was $19.5 million. The debt/equity ratio was 79/21, after a loan of $15.
- Status
- Prospective
- Sector
- Wind, Raw Materials, Power Generation (CCGT), Government, Commercial
- Location
- Turkey
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Adares Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Gestamp Eolica was developing the 10MW Adares wind farm, in Turkey. The project was developed in joint-venture with Faik Celik. The wind farm was located in Selcuk, Izmir province. The turbines were supplied by Gestamp (G90-2.0MW). The project reached financial closure in December 2013, with Garanti Bank. Total project cost was $19.5 million. The debt/equity ratio was 79/21, after a loan of $15.4 million was extended to the project company. |
Original sector | Energy |
Budget |
Location
Country | Turkey |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Wind, Raw Materials, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
