ADDITION 160 Austin ST
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: City of Boston
Add a second floor addition to our home, which includes: Cantilever (1 foot) on the two long sides of the current residence Overhanging deck on the back side (23.5' long by 2.1” wide) Squaring off corner on the front left side of the house to add additional living space (corner approximately size 5'x2')
- Status
- Prospective
- Sector
- Power Generation (CCGT), Residential, Commercial, Government
- Location
- Hyde Park, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ADDITION 160 Austin ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Add a second floor addition to our home, which includes: Cantilever (1 foot) on the two long sides of the current residence Overhanging deck on the back side (23.5' long by 2.1” wide) Squaring off corner on the front left side of the house to add additional living space (corner approximately size 5'x2') |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Hyde Park |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Residential, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
