logo
ProjectOpenBP

ADDITION 29-31 Bayard ST

Open · Massachusetts

Source: City of Boston

Third-floor bathroom + closet add Cut wall 30x80 (install door access) Building walk-in shower. Framing walls around the space as it is possible. Cut the wood floor until it reaches the main drain on the left. Framing the ceiling (wood strapping) Replace the window ( temp glass will be required) Plumbing: running drain pipes, including vent, through the roofing. Shower, toilet, sink, bathtub, Runn

Status
Prospective
Sector
Water Supply and Storage, Power Generation (CCGT), Commercial, Government, Waste Processing and Treatment
Location
Allston, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about ADDITION 29-31 Bayard ST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “ADDITION 29-31 Bayard ST” is an infrastructure initiative in the Water Supply and Storage sector, located in Allston, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Third-floor bathroom + closet add Cut wall 30x80 (install door access) Building walk-in shower. Framing walls around the space as it is possible. Cut the wood floor until it reaches the main drain on the left. Framing the ceiling (wood strapping) Replace the window ( temp glass will be required) Plumbing: running drain pipes, including vent, through the roofing. Shower, toilet, sink, bathtub, Running water pipe ( cold and hot water) Install shower valve shut off valve ( sink, toilet) Electricity: Running electrical by Ma code Recessed lights, exhaust fan, outlets Install dedicated breaker Place insulation, blue-board, and plaster Place the Go-board on the shower walls Place cement board on the floor Place tile on the shower walls Place tile on the shower floor Place curb-shower and door threshold Place tile on the floor, grouting Install baseboard, door trim Painting ceiling, walls, trim, ete Install toilet, shower kit, sink cabinet, Place the shelf on the closet.

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Allston

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Commercial, Government, Waste Processing and Treatment

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project