logo
ProjectArchived

Additional environmental compliance tasks at DCID

The status, timeline and source of this project. A free account opens every field.

Source: Grants.gov

This sole source work will follow up on the work already underway by this cooperator. The prior environmental compliance work assumed that the results of the environmental studies would not require revisions. It turned out that National Historic Preservation Act (NHPA) compliance surveys were positive not negative. The environmental resource surveys for Section 106 of NHPA identified unanticipated

Status
Closed
Sector
Water Supply and Storage, Road, Government, Manufacturing (Industrial)
Location
United States of America
Updated
22 Jul 2026
Source
Grants.gov

ConstructChat

Ask ConstructChat about Additional environmental compliance tasks at DCID

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Additional environmental compliance tasks at DCID” is an infrastructure initiative in the Water Supply and Storage sector, located in United States of America. Taiyo aggregates data on it from Grants.gov.

Participants

Sponsoring Agency

Status

Original status

archived

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This sole source work will follow up on the work already underway by this cooperator. The prior environmental compliance work assumed that the results of the environmental studies would not require revisions. It turned out that National Historic Preservation Act (NHPA) compliance surveys were positive not negative. The environmental resource surveys for Section 106 of NHPA identified unanticipated and significant cultural resources at the project site that will require modifications to the fish passage project implementation Plans and Specifications to avoid and/or mitigate potential project-related impacts. Additionally, design modifications to the Plans are necessary to mitigate potential project-related impacts to elderberry shrubs that were identified and mapped on the project site during environmental studies. To complete the environmental regulatory processes, the following tasks must take place: • Survey and develop revised designs to realign portions of the southern access route to the project site to avoid the identified cultural resources. • Complete additional environmental surveys of the new southern access route alignment. • Develop mitigation strategies and a mitigation design for the northern access route. • Develop design revisions to the DCID irrigation canal to mitigate potential risks to the identified elderberry shrubs.

Location

Country

United States of America (USA)

Source

Source reliability

High

Source

Grants.gov

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Government, Manufacturing (Industrial)

Article published date

2023-06-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project