logo

Additional Financing Norte Grande Electricity Transmission Program

Sector: Power Generation (CCGT) • Location: Argentina

Source: Inter-American Development Bank (IADB)

Project
Closed

The main objective of the Project is to guarantee the coverage of the increasing power demand and the security of the Argentinean Interconnection System (SADI), with the object of contributing to the continuous development of the productive sectors and elevating the standard of life of the population, by rationally making use of the available generation resources of the country. The specific objec

Project Information FAQ

Project Information

5 Q
The project “Additional Financing Norte Grande Electricity Transmission Program” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Argentina. Taiyo aggregates data on it from Inter-American Development Bank (IADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The main objective of the Project is to guarantee the coverage of the increasing power demand and the security of the Argentinean Interconnection System (SADI), with the object of contributing to the continuous development of the productive sectors and elevating the standard of life of the population, by rationally making use of the available generation resources of the country. The specific objectives are: i) to interconnect the electrical systems of the Northeast and Northwest Argentinean regions (NOA ¿ NEA) by using a line of extra high tension (LEAT 500kV and associated Transformation Stations) so it can permit and promote the energy exchange between both regions, improving the prices and increasing the quality and security of the electrical provision, in particular for the macro region of Norte Grande; and ii) to consolidate and expand the regional communication nets (high and med tension lines smaller than 500kV with its respective associated transformation stations), laying the foundations for the productive and social development through giving solution to the problems that attempt against the security and reliability of these systems.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data