Addressing Truck Emissions and Noise at Truck Freight Bottlenecks
Sector: Seaport • Location: Washington, United States of America (USA)
Source: Federal Highway Administration (FHWA)
The objective of this Federal Highway Administration project is to provide information on strategies to address truck emissions and noise at truck freight bottlenecks, including significant highway bottlenecks and intermodal connectors. The project will accomplish these objectives through case studies to develop baseline emissions and noise estimates as well as benefits of mitigation measures at t
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The objective of this Federal Highway Administration project is to provide information on strategies to address truck emissions and noise at truck freight bottlenecks, including significant highway bottlenecks and intermodal connectors. The project will accomplish these objectives through case studies to develop baseline emissions and noise estimates as well as benefits of mitigation measures at three highway freight bottleneck and/or intermodal connector locations. The information from the case studies will help State departments of transportation (DOTs) and metropolitan planning organizations (MPOs) understand the effectiveness and ease of implementation of the mitigation strategies studied, such as highway project design, altering truck characteristics that drive emission rates, and providing supporting infrastructure. The project is divided into two phases. Phase 1 identified three case study locations (Port of Tacoma, WA; Barbours Cut Terminal in Houston, TX; and interchange of I-290 and I-90/94 in Chicago, IL) from an initial list of candidate locations that included 25 candidate bottleneck locations and 10 candidate port or intermodal facility locations. Phase 1 also established emissions and noise modeling protocols to use for the case studies in Phase 2. Phase 2 is currently underway and will complete the modeling for the three case study locations, study the ease of implementation for the mitigation strategies, and provide a final report and case study summary sheets. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
