logo

Adelaide Desalination Plant, South Australia

Sector: Commercial • Location: Thailand

Source: Water Technology

Project
Closed

Trial assembly of the intake cross connection GRP prior to assembly in the tunnel. Two of the three carbon dioxide (CO2) storage vessels. High pressure pump supplying salt water to the reverse osmosis racks. Salt water delivery pipe to the plant showing a static mixer within the pipe. View looking westerly with the Adelaide Desalination Plant (ADP) administration building (glass front) and the wor

Project Information FAQ

Project Information

4 Q
The project “Adelaide Desalination Plant, South Australia” is an infrastructure initiative in the Commercial sector, located in Thailand. Taiyo aggregates data on it from Water Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Trial assembly of the intake cross connection GRP prior to assembly in the tunnel. Two of the three carbon dioxide (CO2) storage vessels. High pressure pump supplying salt water to the reverse osmosis racks. Salt water delivery pipe to the plant showing a static mixer within the pipe. View looking westerly with the Adelaide Desalination Plant (ADP) administration building (glass front) and the work shop building in the foreground, with reverse osmosis / ultra-filtration building #1 behind. Adelaide’s desalination project involved the construction of two 50gl capacity sea water reverse osmosis (SWRO) desalination plants and a 20km transfer pipeline. The A$1.83bn plant was constructed at Lonsdale, near Port Stanvac, approximately 30km south of the Adelaide central business district (CBD). The plant is also known as Port Stanvac Desalination plant. The plant is built on a 32ha site. Sponsored by the South Australian Government and SA Water, it is able to cover around 50% of Adelaide’s annual water supply by delivering up to 100gl of water each year. In August 2011, the Australian Government provided A$228m in funds towards the expansion of the plant to 100gl. The financing was part of the government’s commitment of A$328m towards the project. The first 50gl plant started delivering desalinated drinking water in July 2011 and the first water entered the state’s network in October 2011. The entire plant with 100 gigalitres (gl) of capacity was completed in December 2012. Operation and maintenance of the transfer pipeline was handed over to the owner in May 2012 following a six month testing phase. The plant became fully operational in January 2013. The desalination plant at Port Stanvac was announced by the Government of South Australia in December 2007. An environmental impact statement (EIS) was compiled in November 2008 and its assessment report (AR) was submitted in February 2009 by the Minister for Urban Development and Planning. A land deal for setting up the plant was signed in December 2009. In April 2008, the state government chose SA Water to finance the project. Construction commenced in April 2009, while work on the desalination pipe project began in June 2009. A pilot plant was built in late 2008 to study the desalination technology, process, water quality, and the environment. After studying and collecting data, the pilot plant was decommissioned in February 2011. It was built by Water Technology Australia. The desalination plant was designed by Woodhead. Its integrated industrial design allows it to meet the requirements of architectural work. This design approach was taken to deliver a unified, cohesive, and sustainable design by integrating master-planning, architecture, landscape, and interior design. The plant was designed to have a low visual impact, from both close and long-range views. A transfer pumping station, transfer pipeline, and a visitor centre were also built. Designed as a public interface, the visitor centre has a glazed exhibition space, cantilevered roof forms, and rammed earth walls. More than one million residents and commercial offices in Adelaide are dependent on the Murray River for potable water supply. In recent years, the Murray-Darling Basin has experienced low-flow water volumes due to climate change and severe drought in south-eastern Australia. This situation prompted the South Australian Government to construct the desalination plant to augment water supply. This plant is part of South Australia’s water security plan ‘Water for Good’, which was released in June 2009 and intends to secure the state’s water future to 2050 and beyond. The plant uses reverse osmosis process to remove dissolved salts and impurities from ocean water. Desalinated water from the plant is stored in two storage tanks with a capacity of 25mgl each. Water from the two tanks located at Lonsdale flows into a pumping station, where it is transferred to Happy Valley through the transfer pipeline. To make it suitable for drinking, compounds are added to the water, including lime to improve the taste of water, fluoride to meet Health SA requirements, chlorine to disinfect the water as it is delivered to the Happy Valley Water Filtration Plant, and carbon dioxide to reduce corrosiveness. Desalinated water is mixed with the treated water of Happy Valley Water Treatment Plant and connected to the network system of SA Water. Consisting of the plant, associated marine works, a pumping station, transfer pipeline, and a sub-station, the project was delivered through a design, build, operate, and maintain (DBOM) contract. In February 2009, the South Australian Government had awarded the DBOM contract to AdelaideAqua, a consortium of McConnell Dowell Constructors, Abigroup Contractors, Acciona Agua and Trility (formerly United Utilities Australia). This contract will cover designing, building, operating, and maintaining of the plant for 20 years. The 20km transfer pipeline was constructed by a joint venture of McConnell Dowell and Built Environs. McConnell Dowell, Abigroup Contractors, and Acciona Agua formed a joint venture (JV) to design and construct the plant and associated marine works. Operation and maintenance were undertaken jointly by Acciona Agua and Trility. In April 2009, the engineering design contract was awarded to SMEC. Technical studies and investigations were undertaken by Aurecon. Wonthaggi desalination plant will be the largest in Australia. The new plant is located at Taranto Road, north of Binningup, approximately 150km south of Perth.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data