ADEN WATER SUPPLY
Sector: Water Supply and Storage • Location: Yemen, Republic of
Source: World Bank Group
The project, which constitutes the first construction stage of a long-term water supply master plan, seeks to increase the critically short supply of potable water, and meet the maximum demand up to 1987, in Aden, the capital and largest agglomeration of PDRY, and to rehabilitate the existing system which is fast deteriorating. It provides for the expansion of the distribution network into the poo
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government
- Location
- Yemen
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about ADEN WATER SUPPLY
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project, which constitutes the first construction stage of a long-term water supply master plan, seeks to increase the critically short supply of potable water, and meet the maximum demand up to 1987, in Aden, the capital and largest agglomeration of PDRY, and to rehabilitate the existing system which is fast deteriorating. It provides for the expansion of the distribution network into the poorer districts of Greater Aden to allow low-income residents to be directly connected to the public system. The project also provides for technical assistance aimed at improving PWC's management capability. Part A of the project includes the construction of wells, rehabilitation works, studies, management assistance to PWC and training of its staff; Part B covers the well equipment and water transmission to Aden; and Part C includes the construction of reservoirs, the installation of water disinfection equipment, and the expansion of the distribution network. A total of 328 man-months of consulting services, at an estimated average cost of $8,200 per man-month, is required. Provisions have been made in the project to minimize these risks. |
Original sector | Water, Sanitation and Waste Management |
Location
Country | Yemen |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Yemen, Republic of
- UST Hospital
- ADEN PORT REHABILITATION
- RY-RURAL WATER SUPPLY ADD. FINANCING
- IDA-IFC Agribusiness Program Phase 1
- Yemen Integrated Urban Services Emergency Project
- Additional Financing for Third Social Fund for Development Project
- TIHAMA DEVT SUPPLEMENT
- Yemen: Pilot Program for Climate Resilience Phase I (PPCR I)
