Adenium Jordan - Zahrat Al Salam
Sector: Solar • Location: Jordan
Source: International Finance Corporation (IFC)
The developer, a Dubai-based investment and development company focusing on clean energy and alternative energy sectors worldwide, partnered companies (Clean Energy Concepts, Bright Power, and Martifer Solar) in the installation and development of three greenfield solar PV assets (Al Ward Al Joury, Zahart Al Salam, and Al Zanbaq) each with the capacity of 10 megawatts (MW) (the “Project”; each sin
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The developer, a Dubai-based investment and development company focusing on clean energy and alternative energy sectors worldwide, partnered companies (Clean Energy Concepts, Bright Power, and Martifer Solar) in the installation and development of three greenfield solar PV assets (Al Ward Al Joury, Zahart Al Salam, and Al Zanbaq) each with the capacity of 10 megawatts (MW) (the “Project”; each singular asset referred to as the “Sub-project”) in the Ma’an Development Area (MDA) in Jordan. Each sub-project will consist of approximately 43,562 PV panels on a project area of 260,000 square meters (m2). The entire project will consist of approximately 136,686 PV panels on a project area of 780,000 square meters (m2). Total solar park area is 500 hectares. The project cost for each individual project is estimated at US$30 million with a proposed IFC loan of up to US$10.5 million for IFC’s own account and a syndication of up to US$12.0 million.The solar panels to be installed will convert sunlight to DC (Direct Current) electricity. The DC power will be sent to an inverter to convert the DC power into AC (Alternate Current) power which will then be fed into the utility power grid system through the local substation that is currently under construction by NEPCO. Existing channels in the MDA master plan will be provided to connect the three plants through underground cables to the substation. The substation, to be managed by the National Electric Power Company (NEPCO), will convert power to 132 kV, which will then be transported to the national grid through high voltage transmission lines. The developer will not be responsible for the interconnections as stipulated in the PPA signed in March 2014 (the Transmission Connection Agreement states that the transmission line leaving the substation and connecting to the grid is the responsibility of NEPCO).The project will be located in an area devoid of human settlements; the nearest local community is located 8km away (city of Ma’an). |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
