logo
ProjectPlanned

Adina Lithium Project Expansion

Planned · Quebec · Last reported Dec 2025

Source: The Northern Miner

Li-FT Power agreed to acquire Winsome Resources and a majority stake in the Galinée property to expand its lithium project portfolio in Quebec. The acquisition includes the 100%-owned Adina project, one of the top five largest lithium resources in North America, with significant indicated and inferred lithium resources. The project is expected to have a start-up capital cost of US$259 million and

Status
Prospective
Sector
Power Generation (CCGT)
Location
Quebec, Canada
Updated
22 Jul 2026
Source
The Northern Miner

ConstructChat

Ask ConstructChat about Adina Lithium Project Expansion

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Adina Lithium Project Expansion” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Quebec, Canada. Taiyo aggregates data on it from The Northern Miner.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Li-FT Power agreed to acquire Winsome Resources and a majority stake in the Galinée property to expand its lithium project portfolio in Quebec. The acquisition includes the 100%-owned Adina project, one of the top five largest lithium resources in North America, with significant indicated and inferred lithium resources. The project is expected to have a start-up capital cost of US$259 million and a net present value of US$743 million at an 8% discount rate, based on a 2024 scoping study.

Original sector

Mining

Budget

Location

Country

Canada

State

Quebec

Source

Source

The Northern Miner

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2025-12-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project