logo

Adjaristsqali Georgia LLC

Sector: Manufacturing (Industrial) • Location: Georgia

Source: International Finance Corporation (IFC)

Project
Active

The Project involves the construction and operation of the 184 MW Shuakhevi hydropower project (the “Project”), consisting of 2 HPP schemes: the 178 MW Shuakhevi HPP and the 6 MW Skhalta HPP by Adjaristsqali Georgia Limited (AGL). It is part of the Adjaristsqali cascade of 4 run-of-river HPPs with a total installed capacity of ~400 MW: 178 MW Shuakhevi HPP, 6 MW Skhalta HPP, 150 MW Koromkheti HPP

Project Information FAQ

Project Information

5 Q
The project “Adjaristsqali Georgia LLC” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Georgia. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project involves the construction and operation of the 184 MW Shuakhevi hydropower project (the “Project”), consisting of 2 HPP schemes: the 178 MW Shuakhevi HPP and the 6 MW Skhalta HPP by Adjaristsqali Georgia Limited (AGL). It is part of the Adjaristsqali cascade of 4 run-of-river HPPs with a total installed capacity of ~400 MW: 178 MW Shuakhevi HPP, 6 MW Skhalta HPP, 150 MW Koromkheti HPP and 65 MW Khertvisi HPP. The Project will export to Turkey through the 400 kv Akhalskhe-Borcka transmission line (the “AB line”) and sell domestically in Georgia for the 3 winter months (for the first 10 years of operations).Adjaristsqali Georgia LLC was founded by Clean Energy Invest in 2011. The company is a Georgian special purpose company set up to develop the Adjaristsqali Cascade Project. Today, the owners are; Clean Energy Invest of Norway, Tata Power of India and IFC, via a Dutch holding company called Adjaristsqali Netherlands BV. AGL is assisted in its operation by a very competent team of professionals. The Project has an estimated net generation output of 451 GWh on average per year (as per IFC engineer), corresponding to 4.8% of total annual generation in Georgia and is expected to be operational by July 2016.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data