logo
ProjectPre-Design

Admin BDC Electrical System Improvements MATOC

One of 10,000+ projects Taiyo tracks in Nevada.

Source: Dodge

Repair the electrical system at the Admin Bunker Data Center, install a fixed backup generator, and replace the existing CRAC units with new 20-ton units at the Bureau of Reclamation, Lower Colorado Basin.

Status
Prospective
Sector
Manufacturing (Industrial), Data Center, Residential, Government, Power Generation (CCGT), Commercial
Location
Boulder City, Nevada, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Admin BDC Electrical System Improvements MATOC

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Admin BDC Electrical System Improvements MATOC” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Boulder City, Nevada, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

pre-design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Repair the electrical system at the Admin Bunker Data Center, install a fixed backup generator, and replace the existing CRAC units with new 20-ton units at the Bureau of Reclamation, Lower Colorado Basin.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Nevada

City

Boulder City

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Data Center, Residential, Government, Power Generation (CCGT), Commercial

Article published date

2025-09-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project