Administrative Building Improvements
Sector: Broadband • Location: Eugene, Oregon, United States of America
Source: Dodge USA
Demarcation Building. Network fiber optic cable and network interface panel installation. Conversion of the Solids Storage Building former gas room into a Secondary server room. Maintenance building conference room conversion into a temporary control room and purchase of SCADA consoles for installation. Temporary administrative and operations office trailer acquisition, placement and required util
- Status
- Under Construction
- Sector
- Broadband, Commercial, Power Transmission, Residential, Waste Processing and Treatment, Telecommunications, Road, Government, Steel, Power Generation (CCGT), Water Supply and Storage
- Location
- Eugene, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Administrative Building Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Demarcation Building. Network fiber optic cable and network interface panel installation. Conversion of the Solids Storage Building former gas room into a Secondary server room. Maintenance building conference room conversion into a temporary control room and purchase of SCADA consoles for installation. Temporary administrative and operations office trailer acquisition, placement and required utility hookup. Relocation of office equipment, furniture, supplies, etc. from the existing Administr... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Eugene |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Broadband, Commercial, Power Transmission, Residential, Waste Processing and Treatment, Telecommunications, Road, Government, Steel, Power Generation (CCGT), Water Supply and Storage |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
