logo

Adolfo Suárez Madrid-Barajas International Airport

Sector: Airport • Location: Spain

Source: FCC Construction

Project
Closed

The terminal, with more than half a million square meters built, constitutes one of the largest buildings built of Europe.Among its most representative elements are the cover of 150,000 square meters of corrugated steel, its facades ‘Transparent’ thanks to a curtain wall that covers all the surface, or the ‘canyons’, empty spaces between the ground of the platform and deck through which natural li

Project Information FAQ

Project Information

3 Q
The project “Adolfo Suárez Madrid-Barajas International Airport” is an infrastructure initiative in the Airport sector, located in Spain. Taiyo aggregates data on it from FCC Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The terminal, with more than half a million square meters built, constitutes one of the largest buildings built of Europe.Among its most representative elements are the cover of 150,000 square meters of corrugated steel, its facades ‘Transparent’ thanks to a curtain wall that covers all the surface, or the ‘canyons’, empty spaces between the ground of the platform and deck through which natural lighting penetrates to the lower levels of the building. Special mention requires also the ceiling bamboo, which increases sensations of warmth and visual comfort to the passenger, or the 550 skylights, which allow the entry of naturallight and enable the reduction of energy consumption.The terminal, which is connected to the Satellite building through the three kilometers long airport services tunnel, it has a parking lot with capacity for 9,000 vehicles divided into six modules. These have a cover continuous plant of more than 56,500 square meters, which the positions as the largest plant area continues in Europe.In addition to these infrastructures and facilities, FCC Construcción has executed:

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data