logo

Advanced Data Centres Powered by SMRs at Former Cottam Coal Station

Sector: Nuclear • Location: England, United Kingdom

Source: EconoTimes

Project
Planned

A £11 billion ($15 billion) project led by Holtec International, EDF, and Tritax to create advanced data centres powered by small modular reactors at the former Cottam coal station in central England.

Status
Prospective
Sector
Nuclear, Power Generation (CCGT)
Location
England, United Kingdom
Updated
22 Jul 2026
Source
EconoTimes

ConstructChat

Ask ConstructChat about Advanced Data Centres Powered by SMRs at Former Cottam Coal Station

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Advanced Data Centres Powered by SMRs at Former Cottam Coal Station” is an infrastructure initiative in the Nuclear sector, located in England, United Kingdom. Taiyo aggregates data on it from EconoTimes.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A £11 billion ($15 billion) project led by Holtec International, EDF, and Tritax to create advanced data centres powered by small modular reactors at the former Cottam coal station in central England.

Original sector

Energy and Data Infrastructure

Budget

Location

Country

United Kingdom (UK)

State

England

Source

Source

EconoTimes

URL

More Details

Record type

Project

Sector

Nuclear, Power Generation (CCGT)

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project