logo

Advanced DCB

Sector: Aerospace & Defense • Location: Belgium, Germany, Austria, France, Spain, Italy, Norway, United Kingdom, Switzerland, Croatia, Netherlands, Sweden, Ireland, Denmark, Hungary

Source: EU Funding & Tenders Portal

Project
Ended

The S2020 project “PJ09 Advanced DCB” evolves the existing DCB process to a powerful distributed network management function which takes full advantage from the SESAR Layered Collaborative Planning, Trajectory Management principles and SWIM Technology to improve the effectiveness of ATM resource planning and the network performance of the ATM system in Europe. Solution 1 develops shared situation

Project Information FAQ

Project Information

4 Q
The project “Advanced DCB” is an infrastructure initiative in the Aerospace & Defense sector, located in Belgium, Germany, Austria, France, Spain, Italy, Norway, United Kingdom, Switzerland, Croatia, Netherlands, Sweden, Ireland, Denmark, Hungary. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ended

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The S2020 project “PJ09 Advanced DCB” evolves the existing DCB process to a powerful distributed network management function which takes full advantage from the SESAR Layered Collaborative Planning, Trajectory Management principles and SWIM Technology to improve the effectiveness of ATM resource planning and the network performance of the ATM system in Europe. Solution 1 develops shared situation awareness with respect to demand, capacity and performance impacts. Traffic and demand forecast have improved reliability based on complexity assessment and the computation of confidence indexes. Network Operations will be continuously monitored through Network Performance KPA/KPI. Network impact assessment will analyse trade-offs and facilitate collaborative decision making processes. Solution 2 forms the core functionality of the INAP process (everything which can and should be decided locally. Solution PJ09-02 is the logical follow-up of the SESAR1 Local DCB toolset. It includes: INAP management, ASM integrated into DCB, reconciliation of DCB measures with local complexity management, ATC and Arrival Management. The solution addresses the integration of Local Network Management with extended ATC planning and arrival management activities in the short-term to execution in a seamless process. Solution 3 delivers subsidiary Network Management facilitated by a rolling NOP planning environment (including weather, demand pattern and capacity bottlenecks). Network Operations planning and Execution is managed by an agreed set of rules and procedures, guiding subsidiary DCB and UDPP measures under consideration of trade-offs and network performance targets. Collaborative 4D constraints management integrates AUs priorities and reconciles DCB measures with Airports, ACCs, AU and NM.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data