Advanced Energy Resources Wind, Solar and Battery Project

Sector: Car parking • Location: Australia

Source: Australian Renewable Energy Agency (ARENA)

Project
Current

Second-hand wind turbines, solar and a battery will combine to power a remote mine in Western Australia.How the project worksThis project consists of a hybrid 2.5 MW wind farm, 1 MW solar farm and a 2 MW / 0.5 MWh battery that will provide power to a GMA Garnet’s (GMA) garnet mining and processing operation in Port Gregory, Western Australia.Advanced Energy Resources (AER), a Perth-based renewable

Project Information FAQ

Project Information

5 Q
The project “Advanced Energy Resources Wind, Solar and Battery Project” is an infrastructure initiative in the Car parking sector, located in Australia. Taiyo aggregates data on it from Australian Renewable Energy Agency (ARENA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

current

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Second-hand wind turbines, solar and a battery will combine to power a remote mine in Western Australia.How the project worksThis project consists of a hybrid 2.5 MW wind farm, 1 MW solar farm and a 2 MW / 0.5 MWh battery that will provide power to a GMA Garnet’s (GMA) garnet mining and processing operation in Port Gregory, Western Australia.Advanced Energy Resources (AER), a Perth-based renewable energy developer, generator and electricity retailer will build, own and operate the site, due to be commissioned in December 2019.When complete, the project will be only the second grid-connected project in Australia (after Kennedy Energy Park), and the first in Western Australia to combine solar, wind and a battery into a single hybrid plant.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data