logo

Advanced materials solutions for next generation high efficiency concentrated solar power (CSP) tower systems

Sector: Solar • Location: Italy, Sweden, Spain, United Kingdom, Belgium, Denmark, France, Türkiye, Switzerland

Source: EU Funding & Tenders Portal

Project
Ended

NEXTOWER shall introduce a set of innovative materials to boost the performance of atmospheric air-based concentrated solar power (CSP) systems to make them commercially viable. In particular, tower systems are appealing for the great environmental compatibility and offer tremendous potential for efficient (electrical and thermal) power generation. Yet, their industrial exploitation has been so fa

Project Information FAQ

Project Information

4 Q
The project “Advanced materials solutions for next generation high efficiency concentrated solar power (CSP) tower systems” is an infrastructure initiative in the Solar sector, located in Italy, Sweden, Spain, United Kingdom, Belgium, Denmark, France, Türkiye, Switzerland. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ended

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

NEXTOWER shall introduce a set of innovative materials to boost the performance of atmospheric air-based concentrated solar power (CSP) systems to make them commercially viable. In particular, tower systems are appealing for the great environmental compatibility and offer tremendous potential for efficient (electrical and thermal) power generation. Yet, their industrial exploitation has been so far hindered by limitations in the materials used both for the central receiver - the core component - and for thermal storage. Such limitations dictate maximum working temperature and in-service overall durability (mainly driven by failure from thermal cycling and thermal shocks). Improving the efficiency of a tower system entails necessarily improving the central receiver upstream and possibly re-engineering the whole systems downstream to work longer and at much higher temperature, especially in the thermal storage compartment. NEXTOWER will address this need by taking a comprehensive conceptual and manufacturing approach that will optimize bulk and joining materials for durability at the component level to achieve 25 years of maintenance-free continued service of the receiver and maximum thermodynamic efficiency at the system level. This is made possible through a unique combination of excellence in materials design and manufacturing, CSP full-scale testing facilities brought together in the Consortium, supporting the making of a full-size demo modules SOLEAD (tested in Spain and Italy) within the project. The successful achievement of a new generation of materials allowing for virtually maintenance free operations (limited to ceraminc parts) and increased working temperature shall result in the next-generation of air-coolant CSP highly competitive over other CSP alternatives and sustainable power supply options.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data