Advanced Meter Infrastructure Ami Implementation Phase I
Sector: Water Supply and Storage • Location: San Bernardino, California, United States of America
Source: Dodge USA
Furnish all labor, equipment, and tools to remove 7,504 outdated analog water meters, replacing them with 7,504 advanced meters integrated with Itron 500W cellular ERT communication modules. Furthermore, within the scope of the AMI phase 1 project, 5,042 advanced meters are currently fitted with Itron 100W endpoints. These meters necessitate the replacement of all 100W endpoints with Itron 500W en
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- San Bernardino, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Advanced Meter Infrastructure Ami Implementation Phase I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Furnish all labor, equipment, and tools to remove 7,504 outdated analog water meters, replacing them with 7,504 advanced meters integrated with Itron 500W cellular ERT communication modules. Furthermore, within the scope of the AMI phase 1 project, 5,042 advanced meters are currently fitted with Itron 100W endpoints. These meters necessitate the replacement of all 100W endpoints with Itron 500W endpoints. In addition to this, the project entails supplying the labor, tools, and materials to el... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Bernardino |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-03-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
