Advanced Metering Infrastructure System
Sector: Water Supply and Storage • Location: Warner Robins, Georgia, United States of America
Source: Dodge USA
The City will be replacing 48 6 inch water meters with a new AMI program installed. Contractor will install all Cellular points where needed. Contractor will regulate the system and monitor for stopped or damaged meters. Should a meter need to be repaired / replaced a technician must be sent to complete the work. Annual testing of the new 6 inch meters will be require
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bidding |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The City will be replacing 48 6 inch water meters with a new AMI program installed. Contractor will install all Cellular points where needed. Contractor will regulate the system and monitor for stopped or damaged meters. Should a meter need to be repaired / replaced a technician must be sent to complete the work. Annual testing of the new 6 inch meters will be require |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
