Advanced Metering Infrastructure System
Closed · North Carolina · Last reported Aug 2024
Source: Dodge USA
To include equipment and labor for installation water and electric meters, network, software, and installation services. The AMI system will serve approximately 80,000 residents with City of Gastonia water and/or electric service. The AMI system will include the replacement of approximately 40,000 water and 33,000 electric meters.
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Government, Commercial, Waste Processing and Treatment
- Location
- Gastonia, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Advanced Metering Infrastructure System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | To include equipment and labor for installation water and electric meters, network, software, and installation services. The AMI system will serve approximately 80,000 residents with City of Gastonia water and/or electric service. The AMI system will include the replacement of approximately 40,000 water and 33,000 electric meters. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Gastonia |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
