Advanced Metering Infrastructure System
One of 10,000+ projects Taiyo tracks in Georgia.
Source: Dodge USA
The City will be replacing 48 6 inch water meters with a new AMI program installed. Contractor will install all Cellular points where needed. Contractor will regulate the system and monitor for stopped or damaged meters. Should a meter need to be repaired / replaced a technician must be sent to complete the work. Annual testing of the new 6 inch meters will be require
- Status
- Closed
- Sector
- Government, Commercial, Waste Processing and Treatment, Water Supply and Storage
- Location
- Warner Robins, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Advanced Metering Infrastructure System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City will be replacing 48 6 inch water meters with a new AMI program installed. Contractor will install all Cellular points where needed. Contractor will regulate the system and monitor for stopped or damaged meters. Should a meter need to be repaired / replaced a technician must be sent to complete the work. Annual testing of the new 6 inch meters will be require |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Warner Robins |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Commercial, Waste Processing and Treatment, Water Supply and Storage |
Article published date | 2024-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project