logo

Advanced VPP Grid Integration

Sector: Energy Storage • Location: Australia

Source: Australian Renewable Energy Agency (ARENA)

Project
Closed

The Advanced VPP Grid Integration project aims to show how higher levels of energy exports to the grid from customer solar and battery systems can be enabled through dynamic, rather than fixed, export limits, and to test the value this can create for customers and Virtual Power Plant (VPP) operators.Key resultsSA Power Networks and Tesla have co-designed an Application Programming Interface (API)

Project Information FAQ

Project Information

5 Q
The project “Advanced VPP Grid Integration” is an infrastructure initiative in the Energy Storage sector, located in Australia. Taiyo aggregates data on it from Australian Renewable Energy Agency (ARENA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Advanced VPP Grid Integration project aims to show how higher levels of energy exports to the grid from customer solar and battery systems can be enabled through dynamic, rather than fixed, export limits, and to test the value this can create for customers and Virtual Power Plant (VPP) operators.Key resultsSA Power Networks and Tesla have co-designed an Application Programming Interface (API) that enables the secure real-time exchange of data between Tesla’s and SA Power Networks’ systems via the internetTesla has successfully operated their VPP at exports exceeding their previous static limit of 5kW per site while maintaining compliance with the limits received via the API across a variety of network conditionsIt was found that time-varying and locational export limits could enable DER to be hosted at higher levels of penetration, particularly distributed energy storage VPPs conducting arbitrage between solar and non-solar hoursThe results support the view that a dynamic network capacity management approach can enable larger, more active DER and demand management systems to continue to operate under higher levels of DER penetration than would otherwise be possible with static limits.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data