Advancing Concrete Pavement Technology Solutions
Sector: Cement • Location: United States of America
Source: Grants.gov
The FHWA hereby requests applications for assistance to result in the award of one new Cooperative Agreement, entitled, “Advancing Concrete Pavement Technology Solutions.” This Notice of Funding Opportunity (NOFO) is issued on a competitive basis to all eligible applicants per Section C, Eligible Applicants. The purpose of the proposed Agreement is to further an ongoing Pavement Technology Progr
- Status
- Closed
- Sector
- Cement, Road, Government, Education, Manufacturing (Industrial)
- Location
- United States of America
- Updated
- 22 Jul 2026
- Source
- Grants.gov
ConstructChat
Ask ConstructChat about Advancing Concrete Pavement Technology Solutions
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The FHWA hereby requests applications for assistance to result in the award of one new Cooperative Agreement, entitled, “Advancing Concrete Pavement Technology Solutions.” This Notice of Funding Opportunity (NOFO) is issued on a competitive basis to all eligible applicants per Section C, Eligible Applicants. The purpose of the proposed Agreement is to further an ongoing Pavement Technology Program, which includes the deployment of innovative technologies to improve pavement performance. A key area is the development and transfer of new technologies. It is necessary to deliver tools and guidance documents to States to support the increased knowledge of concrete materials, concrete pavement design, construction, and maintenance. COST SHARING OR MATCHING: Cost sharing or matching is required during performance of the Agreement. The Federal share of the cost of the project is 80 percent. See Legislative Authority in NOFO SECTION A for specific cost share citations. NOTE: The “cost of the project” consists of the Federal share and the cost share combined. Accordingly, the Federal share must be a maximum of 80 percent of the cost of the value of Federal share and cost share combined. The Federal share of the cost of the project can be less than 80 percent, but cannot exceed 80 percent. NOTE: A minimum cost share of 20% is required. Applicants are encouraged to consider the potential benefits of leveraging additional non-federal resources. Although not required, FHWA considers it desirable for applicants to propose up to 50% in non-federal matching contribution. Any additional degree of cost share and leveraging of non-federal funds will be considered beneficial to the extent the cost share is considered feasible and demonstrates a furtherance of the goals of the program. |
Location
Country | United States of America (USA) |
Source
Source reliability | High |
Source | Grants.gov |
URL |
More Details
Record type | Project |
Sector | Cement, Road, Government, Education, Manufacturing (Industrial) |
Article published date | 2023-06-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
