logo

AEF Belvdere Maternity Home

Sector: Residential • Location: Zimbabwe

Source: International Finance Corporation (IFC)

Project
Completed

Summary Of Project Information (SPI)Project Name Zimbabwe: Belvedere Private Hospital (Private) Ltd. (BPH)Region Sub Saharan AfricaSector Social Services (Health Care, Education)Project No 009031Projected Board June 30, 1998DateCompany Name Belvedere Private Hospital (Private) ltd. (BPH)Technical Partner and/or Major ShareholdersBPH is owned almost equally by 16 doctors (12 obstetricians, 4

Project Information FAQ

Project Information

4 Q
The project “AEF Belvdere Maternity Home” is an infrastructure initiative in the Residential sector, located in Zimbabwe. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Summary Of Project Information (SPI)Project Name Zimbabwe: Belvedere Private Hospital (Private) Ltd. (BPH)Region Sub Saharan AfricaSector Social Services (Health Care, Education)Project No 009031Projected Board June 30, 1998DateCompany Name Belvedere Private Hospital (Private) ltd. (BPH)Technical Partner and/or Major ShareholdersBPH is owned almost equally by 16 doctors (12 obstetricians, 4 pediatricians) with established private practices in Harare.Project Cost including proposed IFC investmentThe estimated project cost is US$1,540,000 and IFC is requested to provide an equity investment of US$352,000.Location of project and Description of siteThe project is located in the Harare suburb of Belvedere.  The site, which is about 3,500 sq. meters, consists of an old residence which has been converted to a nursing home.  The new clinic is being built on the site and adjoins the old building.Description of Company and Purpose of ProjectBPH owns the 18 bed Belvedere Maternity Home.  Due to growth in demand, and in order to provide theatre facilities for its patients, BPH is building a new single story clinic which will have 40 ante/post natal beds, 2 theatres and 4 delivery wards.  The old building will be converted into an outpatient unit and same-day procedures center.Environmental Category and IssuesThis is a category B project according to IFC’s environmental review procedure.  Environmental, health and safety issues include handling and disposal of medical materials; disposal of medical and bio-hazardous wastes; disposal of liquid wastes and sewage; power and water supply including fuel storage if applicable; hygiene and implementation of good hospital management practices; CFC-free air conditioning and cold storage equipment; employee health and safety training; and fire protection and safety.  IFC reviewed detailed information provided by the sponsor regarding environmental management and proposed mitigation measures.  All medical and bio-hazardous wastes will be collected by a private waste disposal firm for incineration.  The standby generator will be equipped with a secondary containment structure for the fuel tank.  The hospital will operate on established standards of hygiene and good management practices laid down by the Zimbabwe Public Health Act and enforced by the Ministry of Health and City Health Department.  All employees will be trained in these practices.  The sponsor has agreed to comply with all relevant World Bank fire safety guidelines.  A desk review of the detailed hospital plans will be conducted by a fire safety expert prior to disbursement of IFC funds, to ensure that the facility conforms to World Bank guidelines.     The Environmental Review Summary is expected to be available on or about May 5, 1998, from the Public Information Center.Date SPI sent to PIC May 1, 1998“This summary of Project Information is prepared and distributed to the public in advance of consideration of the proposed transaction by the Corporation’s Board of Directors.  It is provided for the purpose of enhancing the transparency of IFC’s activities and should not be construed as presuming the outcome of IFC Board consideration.”For Additional Information contact:  Corporate Relations Unit Telephone:  (202) 473-7711Facsimile: (202) 974-4384Environmental documents for this project are available at http://www.ifc.org and from the World Bank InfoShop (http://www.worldbank.org/html/pic/aboutinfo.html).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data