AEF Esquire
Sector: Raw Materials • Location: Zambia
Source: International Finance Corporation (IFC)
SUMMARY OF PROJECT INFORMATION (SPI)Project Name: Zambia: Esquire Roses Farm Limited Region: Sub-Saharan AfricaSector: FloricultureProject No: 009465Projected Board June 30, 1999Date:Company Name: Esquire Roses Farm LimitedTechnical Partner and/or Major Shareholders The sponsors of the project are two brothers, Alpesh Patel (30) and Kalpesh Patel (27). They are Indian nationals with Zambian perm
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | SUMMARY OF PROJECT INFORMATION (SPI)Project Name: Zambia: Esquire Roses Farm Limited Region: Sub-Saharan AfricaSector: FloricultureProject No: 009465Projected Board June 30, 1999Date:Company Name: Esquire Roses Farm LimitedTechnical Partner and/or Major Shareholders The sponsors of the project are two brothers, Alpesh Patel (30) and Kalpesh Patel (27). They are Indian nationals with Zambian permanent residence. The main sponsor is Alpesh with a 98% shareholding. He is a mechanical engineer, who prior to moving into rose growing owned an engineering company specializing in the construction of greenhouses and packing shed material. Mr. Kalpesh Patel is also a qualified mechanical engineer who owns and runs a 30 hectare export vegetable project. Project Cost Including proposed IFC investment The project cost is US$930,000 and IFC has been requested to provide a loan of US$465,000.Location of project and Description of site The project is located on a 12-hectare plot in Makeni, 25km west of Lusaka, Zambia.Description of Company and Purpose of Project The project entails the expansion of an existing and successful export rose project from 2 to 4.5 hectares. The expansion will enable the project to benefit from production and marketing economies of scale, thereby significantly improving its margins. Using own funds, the sponsors have already cleared the land and completed construction of the first additional half-hectare greenhouse. The roses will be sold primarily through the Dutch auction system.Environmental Category and IssuesThis is a category B project according to IFC’s environmental review procedure. Key environmental health and safety issues associated with this project include source of water and impacts on other users of proposed irrigation scheme; source of power supply including on-site fuel storage, if applicable; storage, handling and application of agrochemicals; integrated pest management, disposal of solid and liquid wastes including sewage; CFC-free cold storage and air conditioning equipment; provision of employee personal protective equipment; employee health and safety training and monitoring; proper disposal of used pesticides containers; and fire protection and response.The sponsors have provided IFC with details of the procedures and mitigation measures they intend to use to ensure that the project complies with all relevant World Bank Group guidelines. Details of these procedures are provided in the Environmental Review Summary (ERS) for the project, which is expected to be available from the InfoShop on or about April 5, 1999.Host Country location ofenvironmental documents: Environmental Council of Zambia, Corner of Church and Suez Roads Lusaka, Zambia phone: 254130/1, 254146; fax: 254164Date SPI sent to PIC: March 31st 1999“This Summary of Project Information is prepared and distributed to the public in advance of consideration of the proposed transaction by the Corporations Board of Directors. It is provided for the purpose of enhancing the transparency of IFC’s activities and should not be construed as presuming the outcome of IFC Board consideration.”For additional Information contact: Corporate Relations Unit - telephone: (202) 473-7711facsimile: (202) 974-4384Environmental documents for this project are available at http://www.ifc.org and from the World Bank InfoShop (http://www.worldbank.org/html/pic/aboutinfo.html). |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
