logo

AEF Foxtrot Meat Processors CC

Sector: Residential • Location: South Africa

Source: International Finance Corporation (IFC)

Project
Completed

Summary Of Project Information (SPI)Project Name:South Africa-Foxtrot Meat ProcessorsRegion:Sub-Saharan AfricaSector:Food and AgribusinessProject No.:009291Projected BoardDate:February 28, 1999Company Name:Foxtrot Meat Processors (Pty) LtdTechnical Partner and/or Major ShareholdersFoxtrot Meat Processors is a company which is owned 100% by Mr. G.J.L. Pienaar of Moleta, Gauteng Province.Project cos

Project Information FAQ

Project Information

4 Q
The project “AEF Foxtrot Meat Processors CC” is an infrastructure initiative in the Residential sector, located in South Africa. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Summary Of Project Information (SPI)Project Name:South Africa-Foxtrot Meat ProcessorsRegion:Sub-Saharan AfricaSector:Food and AgribusinessProject No.:009291Projected BoardDate:February 28, 1999Company Name:Foxtrot Meat Processors (Pty) LtdTechnical Partner and/or Major ShareholdersFoxtrot Meat Processors is a company which is owned 100% by Mr. G.J.L. Pienaar of Moleta, Gauteng Province.Project cost including proposed IFC investment:Project cost is estimated at US$1.8 million IFC is asked to lend US$890,000.Location of project and description of site: Foxtrot is located in Moleta, a small town 50 Kms north of Pretoria. The abattoir is on a 10 ha site.Description of company and purpose of project: Foxtrot is a well established abattoir with a capacity to slaughter 15 cattle per day. The project is for its expansion to enable it to slaughter 50 cattle and 100 sheep per day.Environmental category and issues: This is a category B project according to IFC’s environmental review procedures. Key environmental, health and safety issues include effluent from slaughterhouse operations; solid wastes from slaughterhouse operations; source of water and power supply including fuel storage if applicable; CFC-free cold storage; plant hygiene and housekeeping; workplace safety, air quality and noise; provision of employee personal protective equipment and training; and fire prevention and response. The sponsor has provided IFC with environmental, health and safety information regarding their methods of operations, as well as proposed mitigation measures to ensure that the project complies with all relevant IFC guidelines. In addition, IFC has reviewed specific details supplied by the project appraisal consultant, individuals involved in designing the effluent treatment system, and the Government of South Africa’s handbook for abattoir operators, which incorporates sections of the Abattoir Hygiene Act. Details of the proposed operating procedures and mitigation measures are provided in the Environmental Review Summary (ERS) for the project, which will be available from the InfoShop on or about December 4, 1998.The Environmental Review Summary is available from the InfoShop.Host country location of environmental documents:IFC Office, Hyde Park, JohannesburgDate SPI sent to InfoShop:December 16, 1998“This Summary of Project Information is prepared and distributed to the public in advance of consideration of the proposed transaction by the Corporation’s Board of Directors. It is provided for the purpose of enhancing the transparency of IFC''s activities and should not be construed as presuming the outcome of IFC Board consideration”.For additional Information contact: Corporate Relations Unit –Telephone: (202) 473-7711Facsimile: (202) 974-4384Environmental documents for this project are available at http://www.ifc.org and from the World Bank InfoShop (http://www.worldbank.org/html/pic/aboutinfo.html).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data