logo

AEF Hygeia Nigeria Limited

Sector: Waste Processing and Treatment • Location: Nigeria

Source: International Finance Corporation (IFC)

Project
Completed

Summary of Project Information (SPI)Project Name NIGERIA: Hygeia Nigeria LimitedRegion Sub-Saharan AfricaSector Social Services (Health Care, Education)Project No. 009628Projected Board June 25, 1999DateCompany Name Hygeia Nigeria LimitedTechnical Partner and/or Major Shareholders There is no technical partner. The company has a technical agreement with Health Partners, a health management

Project Information FAQ

Project Information

4 Q
The project “AEF Hygeia Nigeria Limited” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Nigeria. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Summary of Project Information (SPI)Project Name NIGERIA: Hygeia Nigeria LimitedRegion Sub-Saharan AfricaSector Social Services (Health Care, Education)Project No. 009628Projected Board June 25, 1999DateCompany Name Hygeia Nigeria LimitedTechnical Partner and/or Major Shareholders There is no technical partner. The company has a technical agreement with Health Partners, a health management organization based in Minneapolis, USA to provide training and advice. The principal sponsors of the project are Professor E.A. Elebute and his wife Professor O.W. Elebute, a husband and wife team who were founding members of the leading University Teaching Hospital in Lagos in the early 1960’s. The two principal promoters own 55% of the shares. Other major shareholders are three leading insurance companies, UNIC Insurance Plc (12%), African Alliance Insurance Company (8.3%) and Lion of Africa Insurance Plc (8.3%).Project Cost Including Proposed IFC Investment Project cost including proposed IFC investment: US$2,186,000 equivalent including a proposed IFC investment of US$581,000.Location of Project and Description of Site Project Location: The project will be located in Lagos, Nigeria. Lagoon Hospital is located Apapa, Lagos and proposed model clinics will all be located in Lagos.Description of Company and Purpose of Project(include IFC’s Role and Development Impact) Hygeia Nigeria Limited was established in 1984. It owns and operates Lagoon hospital, a 40 bed hospital in Apapa, Lagos which opened in 1986. The hospital provides tertiary health care services and preventive health screening facilities to a high end niche and care in various medical specializations. It also operates satellite clinics for its corporate clients within the clients’ premises. The company offers a managed care scheme which provides primary and secondary level health care services to large corporate clients in the Lagos metropolis at a fixed cost. The project is intended to upgrade existing tertiary health care services at Lagoon Hospital and expand the company’s managed care business. The managed care product satisfies customers’ current buying criteria of low cost and quality service while eliminating the problem of fraud and abuse. IFC will be providing a loan with longer maturities than presently available in Nigeria. The managed care scheme will ensure the maintenance of quality while reducing the cost of healthcare delivery.Environmental Category and IssuesThis is a category B project according to IFC''s environmental and social review procedure. Environmental issues associated with this project include: Site location, prior use and land acquisition process; handling and storage of medical material; storage, handling and final disposal of chemicals; source of water and power supply; hygiene and implementation of good medical management practices; waste management; CFC free air conditioning and cold storage equipment; provision of employee protective clothing and equipment; exposure of employees to radioactive material; employees health and safety training; and fire prevention.The sponsor has presented plans to address these issues and demonstrate that the proposed project will comply with applicable governmental and World Bank requirements. In particular, the fuel storage area is to be protected by retention bunds; medical supplies and chemicals will be locked in the Pharmacy Store and handled by regularly trained staff.At IFC’s request, the sponsor has commissioned a consultant to undertake the development and implementation of a comprehensive waste management plan. Hazardous and biomedical wastes are collected separately and will be incinerated in situ in a specifically built incinerator that the sponsor has undertaken to install. The Lagos Municipal Incinerator represents another facility, which could be used if it is adequately licensed to accept these types of waste and deemed adequate after a site visit by the IFC environment department.Sharp objects such as needles and blades are currently being secured in refuse cans before being disposed, together with other hazardous and bio-medical waste by the Waste Disposal Authority, to an authorized landfill together with other solid waste.Sanitary waste is disposed of in septic tanks incorporating filter soakaway and are regularly emptied. The sludges are discharged to an authorized landfill. Other wastewater, essentially kitchen wastewater and laundry waste water, is treated in separate soakaway pits. All treated effluents from the septic tanks and soakaway pits percolate into the ground. The sponsor has developed an adequate health and safety plan including an emergency response and evacuation plan and fire safety is ensured by an alarm, fire extinguishers and reels of hoses on each floor. Plans have been made to install smoke detectors and automatic water sprinklersThe Environmental Review Summary is available from the Public Information Center Host country location of Federal Environmental Protection Agency (FEPA)environmental documents Apapa local government HeadquartersDate SPI sent to InfoShop May 25, 1999“This Summary of Project Information is prepared and distributed to the public in advance of consideration of the proposed transaction by the Corporation’s Board of Directors. It is provided for the purpose of enhancing the transparency of IFC’s activities and should not be construed as presuming the outcome of IFC Board consideration.”For Additional Information contact: Corporate Relations Unittelephone: (202) 473-7711facsimile: (202) 974-4384Environmental documents for this project are available at http://www.ifc.org and from the World Bank InfoShop (http://www.worldbank.org/html/pic/aboutinfo.html).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data