logo

AEF Lesedi Hospital Proprietary Limited

Sector: Waste Processing and Treatment • Location: South Africa

Source: International Finance Corporation (IFC)

Project
Completed

SUMMARY OF PROJECT INFORMATION (SPI)Project Name South Africa-Lesedi Private Hospital, GautengRegion Sub-Saharan AfricaSector Medical ServicesProject Number 008293Projected Board Date July 1, 1997Company Name Lesedi Private Hospital (Proprietary) LimitedTechnical Partner and/or Major ShareholdersThe sponsors are Kwacha Holdings Limited (90%) and Afrox Limited (10%).  The hospital is managed

Project Information FAQ

Project Information

4 Q
The project “AEF Lesedi Hospital Proprietary Limited” is an infrastructure initiative in the Waste Processing and Treatment sector, located in South Africa. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

SUMMARY OF PROJECT INFORMATION (SPI)Project Name South Africa-Lesedi Private Hospital, GautengRegion Sub-Saharan AfricaSector Medical ServicesProject Number 008293Projected Board Date July 1, 1997Company Name Lesedi Private Hospital (Proprietary) LimitedTechnical Partner and/or Major ShareholdersThe sponsors are Kwacha Holdings Limited (90%) and Afrox Limited (10%).  The hospital is managed by Dr. Andre Nel, an MBA graduate and former medical practitioner.Project cost including proposed IFC investmentProject Cost: US$556,000 equivalentIFC Investment: US$267,000 equivalent (quasi-equity)Location of project and Description of SiteThe project’s facilities will be located in Soweto, Gauteng Province.Description of Company and Purpose of ProjectThe project involves the addition of a 9-bed ICU facility to Lesedi Private Hospital’s (LPH) operations.  LPH comprises 202-beds but still lacks an appropriate and highly demanded ICU facility.  The only other hospital in Soweto with ICU facilities is the government hospital, Baragwanath, which cannot cope.Project Development EffectsLPH will contribute significantly towards meeting the health care needs of people from previously disadvantaged groups. The creation of an ICU facility at LPH is likely to create career opportunities for medical staff from previously disadvantaged groups and ensure more productive use of local experts, who are precluded from rendering services to previously white-owned hospitals.Environmental Categories and IssuesThis is an environmental review Category B project.  Environmental, health and safety issues associated with this project include medical materials handling, disposal of medical waste, power and water supply, hygiene and implementation of good hospital management practices, CFCs, employee health and safety, training and fire protection.  The Company has a comprehensive manual dealing with medical materials handling and disposal of medical waste.  Contaminated linen are bagged in sealed water-soluble bags before sending to the laundry.  Needles are not recapped and are sent for incineration.  Contaminated dressings and hazardous waste is bagged in sealed red bags and sent to hospital incinerator for disposal.  Fluid waste is absorbed by the municipal sewage system.  The hospital policy is to use “Universal Precautions” as its infection control system.  This assumes that all patients are potentially infectious and appropriate precautions are taken.  The fire precaution system is regularly serviced.  The hospital will not have a water sprinkler system in the ICU because water damage to ICU equipment could threaten the lives of patients.   The ERS is expected to be available at the Public Information Center on/or about June 2, 1997.Date SPI Sent to PIC: April 29, 1997For additional information contact: Corporate Relations UnitTel. (202) 473-7711Fax. (202) 974-4384Environmental documents for this project are available at http://www.ifc.org and from the World Bank InfoShop (http://www.worldbank.org/html/pic/aboutinfo.html).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data