AEF Mosa Court Apartments
Sector: Raw Materials • Location: Uganda
Source: International Finance Corporation (IFC)
Environmental Review Summary (ERS)Project Name AEF-UGANDA: Bulangiti Farm/Mosa Court ApartmentsRegion Sub-Saharan AfricaSector Hotels and ResortsProject No. 008727 November 6, 19971. This project involves the development of an extension, through refurbishment of 16 apartments and construction of a 25 unit apartment block, of the existing 12 Mosa Court apartments in Kampa
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Environmental Review Summary (ERS)Project Name AEF-UGANDA: Bulangiti Farm/Mosa Court ApartmentsRegion Sub-Saharan AfricaSector Hotels and ResortsProject No. 008727 November 6, 19971. This project involves the development of an extension, through refurbishment of 16 apartments and construction of a 25 unit apartment block, of the existing 12 Mosa Court apartments in Kampala. The complex will be equipped with a swimming pool, health club, staff quarters, roads and a support facility on a 3 acre site. Total project cost is estimated at US$2.6 million of which AEF has been approached to provide financing totaling US$800,000.2. This is a category B project according to IFC’s environmental review procedure because specific impacts may result which can be avoided or mitigated by adhering to generally recognized performance standards, guidelines or design criteria. The review of this project consisted of the appraisal of technical and environmental information submitted by the project sponsor and completed by IFC’s Environment Department staff. The key environmental, health and safety issues considered in this project include:· land use;· sewage treatment\disposal;· liquid and solid waste;· CFC-free cold storage and air conditioning;· fire safety measures; and· employee training and general safety.The sponsor has presented information to address these issues and demonstrate that the proposed project will comply with applicable governmental and World Bank requirements. The information provided about how these potential impacts are addressed in the development of the project is summarized in the paragraphs that follow.3. The project has been deemed consistent and in compliance with local zoning laws, land use practices and local sanitation and environmental requirements. The site has been a residential rental complex since 1954 and will continue to remain so as part of this refurbishment and expansion scheme. The sponsors have indicated that there is no public objection to the project, and the Kampala City Council has approved the plans and designs.4. Sewage and all liquid waste, from all point sources (e.g., kitchen and laundry operations), will be disposed of directly to the Kampala City Council sewer system. Solid waste from all point sources will be stored in waterproof bins and periodically disposed of by the Kampala City Council at the Gayaza Road landfill, as per local laws and regulations.5. Water is supplied through the city mains. Supply at the site has been tested and conforms with WHO standards for drinking water. The complex will be connected to the national grid for power supply. A backup diesel generator has been installed, with secondary containment to prevent accidental leaks. 6. The sponsors architects have confirmed, in writing, that the project is being designed to comply with World Bank Fire Safety guidelines. In addition, as a condition of IFC’s loan disbursement, the sponsor will have a desk review of project design completed by an independent fire safety expert/firm.7. Employees will be provided with appropriate safety equipment, and periodic training, including emergency response preparedness.8. The complexes refrigeration and ac units will be CFC-free. No hazardous substances or wastes will be generated from operations.9. IFC will ensure ongoing compliance with World Bank environmental, health and safety policies and guidelines during the life of the project by evaluating monitoring reports submitted annually to IFC by Bulangiti Farm/Mosa Court and by conducting periodic supervisions.10. Based on its review of available information regarding potential environmental impacts and proposed mitigation measures, IFC concludes that the proposed project is being designed to meet Government of Uganda requirements, and World Bank policies, and environmental, health and safety guidelines.AEF\UGANDA\MOSA.ERS |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
