AEF NOSA III
Sector: Oil and Gas • Location: Cameroon
Source: IFC Project Disclosures
The project involves - the upgrade of the existing plant, including the installation of appropriate waste water treatment; and - expansion of the production capacity from 8,700 to 17,400 tpa. Nosa Sarl (the company) specializes in the production of laundry soap, using both locally produced and imported palm oil as the main raw material. The total expansion project cost is estimated at €2
- Status
- Prospective
- Sector
- Oil and Gas, Water Supply and Storage
- Location
- Cameroon
- Updated
- 19 Nov 2026
- Source
- IFC Project Disclosures
ConstructChat
Ask ConstructChat about AEF NOSA III
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project involves - the upgrade of the existing plant, including the installation of appropriate waste water treatment; and - expansion of the production capacity from 8,700 to 17,400 tpa. Nosa Sarl (the company) specializes in the production of laundry soap, using both locally produced and imported palm oil as the main raw material. The total expansion project cost is estimated at €2.014 million, and IFC is requested to provide a loan of €0.8 million to the company. |
Original sector | GA - Soap and Cleaning Compound (Soap, Detergent, etc.) |
Location
Country | Cameroon |
Source
Source | IFC Project Disclosures |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Water Supply and Storage |
Article published date | 2026-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
