Environmental Review Summary (ERS) Project Name Tanzania-Pallsons Consumer Industries Ltd.Region AfricaSector AgribusinessProject No. 007702 August 27, 1996 1. This project involves the establishment of vegetable oil production plant. The plant will be located in Arusha at the Themi Industrial Estate and will have the capacity to produce 4,500 tons of refined sun

Project Information FAQ

Project Information

4 Q
The project “AEF Pallsons Consumer Industries Limited” is an infrastructure initiative in the Raw Materials sector, located in Tanzania. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Environmental Review Summary (ERS) Project Name Tanzania-Pallsons Consumer Industries Ltd.Region AfricaSector AgribusinessProject No. 007702 August 27, 1996 1. This project involves the establishment of vegetable oil production plant. The plant will be located in Arusha at the Themi Industrial Estate and will have the capacity to produce 4,500 tons of refined sunflower and/or cotton seed oil. Total project cost is estimated at US$1.8 million of which AEF has been approached to provide a loan of US$500,000.2. This is a category B project according to IFC’s environmental review procedure because specific impacts may result which can be avoided or mitigated by adhering to generally recognized performance standards, guidelines or design criteria. The review of this project consisted of appraising technical and environmental information submitted by the project sponsor. The following potential environmental, health and safety impacts of the project were analyzed:· boiler/air emissions;· liquid and solid waste disposal;· fuel storage;· employee training and safety; and· fire protection. The sponsor has presented plans to address these issues and demonstrate that the proposed project will comply with applicable governmental and World Bank requirements. The information provided about how these potential impacts are addressed in the development of the project is summarized in the paragraphs that follow.3. The boiler will be operated with diesel oil and will comply with the World Bank guidelines. It will be inspected before and after installation by local inspectors. The sponsor will submit to IFC data regarding boiler air emissions immediately after the supplier provides this information to the sponsor.4. The liquid wastes, which are generated by oil washing with soda caustic and brine, are disposed of in a septic tank. The solid wastes generated include husk and seed cake. Twenty percent of the husk is reused, the remaining 80 percent is sold as secondary fodder for animal feed. The seed cake is a secondary product of the plant and is sold as premier animal feed. 5. A 15 day fuel supply will be stored in secondary containment storage tanks. The sponsor has fire fighting equipment including hoses and pumps to assist combat potential fires, has installed water outlets and an early warning system to assist in the immediate evacuation of the building.6. Pallsons has established Fire Safety and Occupational Health and Safety programs which comply with governmental standards and World Bank guidelines. Employees are trained with regard to plant safety rules, accident prevention, hazards of the workplace, fire safety and use of Personnel Protective Equipment (PPE).7. Based on its review of available information regarding potential environmental impacts and proposed mitigation measures, IFC concludes that the proposed project is being designed to meet Government of Tanzania requirements, and World Bank policies, and environmental, health and safety guidelines.8. IFC will monitor Pallsons’ ongoing compliance with World Bank policies and guidelines during the life of the project by evaluating monitoring reports submitted annually to IFC by the sponsor and by conducting periodic site reviews during project supervision.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data