AEF Societe de Transports et de Commerce Bogoya et Freres (STCBF)

Sector: Warehouse • Location: Burkina Faso

Source: International Finance Corporation (IFC)

Project
Completed

Environmental Review Summary (ERS)Project Name AEF:BURKINA FASO-STCBFRegion Sub-Saharan AfricaSector ManufacturingProject No. 008764 January 5 19981. The project is to acquire 15 reconditioned commercial vehicles (2 petroleum tanker trucks and 13 trailer trucks), and to build and operate a vehicle maintenance garage in Bobo-Dioulasso and a spare stock warehouse in Ouagadougou. With

Project Information FAQ

Project Information

4 Q
The project “AEF Societe de Transports et de Commerce Bogoya et Freres (STCBF)” is an infrastructure initiative in the Warehouse sector, located in Burkina Faso. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Environmental Review Summary (ERS)Project Name AEF:BURKINA FASO-STCBFRegion Sub-Saharan AfricaSector ManufacturingProject No. 008764 January 5 19981. The project is to acquire 15 reconditioned commercial vehicles (2 petroleum tanker trucks and 13 trailer trucks), and to build and operate a vehicle maintenance garage in Bobo-Dioulasso and a spare stock warehouse in Ouagadougou. With the 15 newly acquired trucks, 7 existing tanker trucks, and garage and warehouse and facilities, the sponsor would cover the commercial national long haulage and international transportation markets between Burkina Faso and neighboring coastal countries. 2. This is a category B project according to IFC’s environmental review procedure because specific impacts may result which can be avoided or mitigated by adhering to generally recognized performance standards, guidelines or design criteria. The review of this project consisted of appraising technical and environmental information submitted by the project sponsor, and the technical appraisal and site review completed by IFC’s staff. The following potential environmental, health and safety impacts of the project were analyzed:· garage and warehouse site selection, acquisition, and construction;· existing vehicle repair plot soil and groundwater contamination;· garage liquid and solid waste handling;· garage chemical and hazardous material handling and storage;· fire protection and emergency response;· vehicle safety inspection and maintenance program; and· general employee health and safety, including training.The sponsor has presented plans to address these issues and demonstrate the proposed project will comply with applicable governmental and World Bank requirements. The information provided about how these potential impacts are addressed in the development of the project is summarized in the paragraphs that follow.3. The 1,000 m2 site selected by the sponsor has been authorized by the local authorities. The design is completed and follows the planning and urbanistic guidelines of the area.4. The sponsor is implementing a management plan to prevent spills and thereby ground contamination. All packaging and discarded oil materials will be properly disposed. The oil contaminated liquid effluent will be sold for recycling. The domestic liquid effluents will be disposed in septic tanks which will be maintained periodically.5. Minor amount of toxic substances will be used by the sponsor. Noise levels will be below the World Bank guidelines.6. The sponsor will have a fire safety program in place. Fire extinguishers will be installed at appropriate places. The employees will be trained on fire safety measures.7. The vehicle fleet will carry fire extinguishers and will have regular safety inspections and maintenance check ups following the local regulations. The maximum local allowed speed of 80 km/hr will be enforced by the sponsor. All employees will have annual medical checkups and will be provided with and required to use the relevant personal protective equipment8. Based on its review of available information regarding potential environmental impacts and proposed mitigation measures, IFC concludes that, the proposed project is being designed to meet Government of Burkina Faso requirements, and World Bank policies, and environmental, health and safety guidelines.9. IFC will monitor ongoing compliance with World Bank policies and guidelines during the life of the project by evaluating monitoring reports submitted annually to IFC by the sponsor and by conducting periodic site reviews during project supervision.L:\WPEU\JOSEFINA\AEF\BURKINA\STCBF.ERSJanuary 5, 1998 3:30 PM

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data