logo

AEF Telipoint Nigeria Limited

Sector: Residential • Location: Nigeria

Source: International Finance Corporation (IFC)

Project
Completed

Environmental Review Summary (ERS)Project Name AEF/Nigeria: Andchristie Company Limited (ACL)Region Sub-Saharan AfricaSector TelecommunicationsProject No. 007964 1. This project involves the establishment of a public (card) pay phone network in Lagos State. A total of 100 telephones will be installed in strategic locations, equipment will be supplied from South Africa. Total

Project Information FAQ

Project Information

4 Q
The project “AEF Telipoint Nigeria Limited” is an infrastructure initiative in the Residential sector, located in Nigeria. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Environmental Review Summary (ERS)Project Name AEF/Nigeria: Andchristie Company Limited (ACL)Region Sub-Saharan AfricaSector TelecommunicationsProject No. 007964 1. This project involves the establishment of a public (card) pay phone network in Lagos State. A total of 100 telephones will be installed in strategic locations, equipment will be supplied from South Africa. Total project cost is estimated at US$418,000 of which AEF has been approached to provide a loan of US$168,000.2. This is a category B project according to IFC’s environmental review procedure because specific impacts may result which can be avoided or mitigated by adhering to generally recognized performance standards, guidelines or design criteria. The review of this project consisted of the appraisal of technical and environmental information submitted by the project sponsor and completed by IFC’s Environment Department staff. The key environmental, health and safety issues considered in this project include:· wireline right-of-way;· waste disposal;· PCBs;· employee safety and training; and· office fire protection measures.The sponsor has presented plans to address these issues and demonstrate that the proposed project will comply with applicable governmental and World Bank requirements. The information provided about how these potential impacts are addressed in the development of the project is summarized in the paragraphs that follow.3. Andchristie Company Limited, will almost exclusively receive its network of phones lines from the national carrier, Nigerian Telecommunications Plc. (NITEL). Their lines will be delivered as either card phone lines or individual subscriber lines using existing cable networks. Andschristie Co. Ltd., does not have plans for land acquisition, or creation of any new right-of-way access.4. ACL will receive its components and equipment used in its operation from suppliers in South Africa. ACL will not handle or produce any hazardous materials or radioactive substances. Harmful solid or liquid wastes will not be produced, stored or release to the environment.5. ACL, does not currently have nor will it install electrical equipment containing PCBs.6. ACL worker safety programs are designed to comply with World Bank health and safety requirements and relate to training and provision of personal protective equipment. ACL has developed training programs for all levels of staff, including in-house training for old and new employees, training agreements with equipment suppliers and short courses on diverse management and engineering issues. 7 The sponsor will annually submit to IFC a monitoring report outlining the environmental performance of the project.8. Based on its review of available information regarding potential environmental impacts and proposed mitigation measures, IFC concludes that the proposed project is being designed to meet Government of Nigeria requirements, and World Bank policies, and environmental, health and safety guidelines.L:\CAF\AEF\NIR\ANDCHERS.DOC

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data