AEMO Connections Tool Project
Source: Australian Renewable Energy Agency (ARENA)
This project will leverage a new high-speed simulator that AEMO is currently developing to implement a Next Generation Connections Tool (the Connections Tool). The Connections Tool Project, combined with the development of an in-house operations simulator, is the first step of a staged approach for delivery of AEMO’s Australian Energy Simulation Centre (AESC), which was investigated through the AR
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project will leverage a new high-speed simulator that AEMO is currently developing to implement a Next Generation Connections Tool (the Connections Tool). The Connections Tool Project, combined with the development of an in-house operations simulator, is the first step of a staged approach for delivery of AEMO’s Australian Energy Simulation Centre (AESC), which was investigated through the ARENA-supported ‘National Energy Simulator Feasibility Study ’ completed in July 2019. The Study found that the AESC was technically feasible and could be economically beneficial to the electricity system and identified a suite of seven tools, including two priority tools, the Operations Simulator and the Connections Simulation Tool. The Connections Tool will help connections applicants, their original equipment manufacturers (OEMs) and consultants, Network Service Providers (NSPs), and AEMO collaborate using common data sets to rapidly verify that prospective generators can be safely connected to the electricity network. The Connections Tool will be developed and rolled out in three phases to progressively larger numbers of users. During each phase, the AEMO will engage with users and incorporate stakeholder feedback into successive releases. On completion of the project, connections applicants will have the option to perform studies incorporating new plant models with wide-area power system models equivalent to those used by AEMO to assess connections applications. In doing so, connections applicants will be able to better design their generating system and have increased confidence that the study outcomes will meet the required acceptance criteria. This is expected to significantly streamline the applications process, reducing the risk, costs, and timeframe to complete connections approval.Additional impactIndustry input will shape the solution of the Connection Tool. This will include active involvement from industry trial participants, working groups and also providing visibility through industry forums and communications. If you would like to be involved or find out more please contact AEMO via ConnectionsTool@aemo.com.au. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
