logo

Aeolus - Ngong Wind Project

Sector: Wind • Location: Kenya

Source: World Bank Group

Project
Active

Aeolus Power Ltd., a local Kenyan project devloper, applied to build, own and operate a 160 MW wind farm to be located in the aeolus Hills, Kenya. The first phase of the project was 60.8 MW. GE had been selected as the equipment supplier, and was contracted for 38, 1.6 MW turbines.

As of December 2012, the PPA for the project had been signed with Kenya Power, the details of which were not relea

Project Information FAQ

Project Information

4 Q
The project “Aeolus - Ngong Wind Project” is an infrastructure initiative in the Wind sector, located in Kenya. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Aeolus Power Ltd., a local Kenyan project devloper, applied to build, own and operate a 160 MW wind farm to be located in the aeolus Hills, Kenya. The first phase of the project was 60.8 MW. GE had been selected as the equipment supplier, and was contracted for 38, 1.6 MW turbines. As of December 2012, the PPA for the project had been signed with Kenya Power, the details of which were not released. The project was rapidly approaching financial close; Standard Bank was selected as lead arranger and JP Morgan to handle registration under the CDM mechanism. Comissioning for the first 60.8 MW phase was expected by the end of 2013.Total project cost was estimated at 16 billion Kenyan shillings (USD 171 million). Update: Reported as under construction http://www.bloomberg.com/news/2011-11-15/aeolus-starts-on-kenyan-wind-power-project-business-daily-says.html http://www.windpowermonthly.com/news/1110661/Kenyas-608MW-project-moves-forward/ i) http://www.theeastafrican.co.ke/business/CFC-Stanbic-invests--150m-in-wind-power-project-deal-/-/2560/2019684/-/eonxl0z/-/index.html ii) ttps://global.factiva.com/ga/default.aspx

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data