logo

AEP $4.2 Billion 765-kV Transmission Infrastructure Build

Sector: Data Center • Location: Portsmouth, Ohio, United States

Source: Bitget

Project
Planned

AEP Ohio plans to build $4.2 billion in new 765-kV transmission infrastructure to serve a 10-gigawatt data center campus at the decommissioned Portsmouth Gaseous Diffusion Plant in southern Ohio, known as the PORTS Technology Campus. The project is a multi-year capital commitment with power delivery expected to begin in 2029. SoftBank's affiliate SB Energy is funding the transmission investments t

Status
Prospective
Sector
Data Center, Power Generation (CCGT), Seaport
Location
Portsmouth, Ohio, United States of America
Updated
22 Jul 2026
Source
Bitget

ConstructChat

Ask ConstructChat about AEP $4.2 Billion 765-kV Transmission Infrastructure Build

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “AEP $4.2 Billion 765-kV Transmission Infrastructure Build” is an infrastructure initiative in the Data Center sector, located in Portsmouth, Ohio, United States. Taiyo aggregates data on it from Bitget.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

AEP Ohio plans to build $4.2 billion in new 765-kV transmission infrastructure to serve a 10-gigawatt data center campus at the decommissioned Portsmouth Gaseous Diffusion Plant in southern Ohio, known as the PORTS Technology Campus. The project is a multi-year capital commitment with power delivery expected to begin in 2029. SoftBank's affiliate SB Energy is funding the transmission investments to avoid rate increases for Ohio residents, mitigating financial risk for AEP.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Ohio

City

Portsmouth

Source

Source

Bitget

URL

More Details

Record type

Project

Sector

Data Center, Power Generation (CCGT), Seaport

Article published date

2026-03-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project