Aeration Basins Diffuser Replacement Phase 1
Sector: Power Generation (CCGT) • Location: Martinez, California, United States of America
Source: Dodge USA
The Project generally consists of major renovation of Aeration Basin (A/N Tank) 1A, 1B, 1C, & 1D, and includes demolition, structural, mechanical, electrical, instrumentation, and controls upgrades for diffuser replacement in the Basins. Seismic retrofitting of the Basin is included as an alternative (optional) bid item. The District, at its discretion, may add additional construction activities a
- Status
- Closed
- Sector
- Power Generation (CCGT), Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial), Water Supply and Storage
- Location
- Martinez, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Aeration Basins Diffuser Replacement Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project generally consists of major renovation of Aeration Basin (A/N Tank) 1A, 1B, 1C, & 1D, and includes demolition, structural, mechanical, electrical, instrumentation, and controls upgrades for diffuser replacement in the Basins. Seismic retrofitting of the Basin is included as an alternative (optional) bid item. The District, at its discretion, may add additional construction activities after award of the Construction Contract. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Martinez |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial), Water Supply and Storage |
Article published date | 2023-05-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
