logo
ProjectPlanned

Aeroderivative Gas Turbines Project

The owner, status and timeline of this project. A free account opens every field.

Source: AOL

Platte River Power Authority has received a construction permit from the Colorado Air Pollution Control Division to build five aeroderivative gas turbines. These turbines will provide dispatchable capacity to fill gaps when renewable sources like wind and solar are insufficient. The turbines are expected to be operational before the closure of the Rawhide 1 coal unit in December 2029, with a 180-d

Status
Prospective
Sector
Wind, Power Generation (CCGT), Solar, Commercial
Location
Larimer County, Colorado, United States of America
Updated
22 Jul 2026
Source
AOL

ConstructChat

Ask ConstructChat about Aeroderivative Gas Turbines Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Aeroderivative Gas Turbines Project” is an infrastructure initiative in the Wind sector, located in Larimer County, Colorado, United States. Taiyo aggregates data on it from AOL.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Platte River Power Authority has received a construction permit from the Colorado Air Pollution Control Division to build five aeroderivative gas turbines. These turbines will provide dispatchable capacity to fill gaps when renewable sources like wind and solar are insufficient. The turbines are expected to be operational before the closure of the Rawhide 1 coal unit in December 2029, with a 180-day overlap period for testing. Once the turbines are cleared for commercial dispatch, Rawhide 1 will close.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Colorado

City

Larimer County

Source

Source

AOL

URL

More Details

Record type

Project

Sector

Wind, Power Generation (CCGT), Solar, Commercial

Article published date

2026-05-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project