logo

AES Khrami I & II

Sector: Energy Storage • Location: Georgia

Source: World Bank Group

Project
Cancelled

AES singed an agreement in January 2000 to acquire control of three electric generating facilities in the Republic of Georgia with a combined capacity of 823 MW. AES Gardabani Holdings BV purchased the 600 MW Gardabani thermal power plant which consists of two 300 MW supercritical gas and oil-fired units that were constructed in 1990. AES Georgia Holdings BV acquired 25-year management contract fo

Status
Closed
Sector
Energy Storage, Hydro, Geothermal, Oil and Gas, Power Generation (CCGT), Power Transmission, Government
Location
Georgia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about AES Khrami I & II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “AES Khrami I & II” is an infrastructure initiative in the Energy Storage sector, located in Georgia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

cancelled

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

AES singed an agreement in January 2000 to acquire control of three electric generating facilities in the Republic of Georgia with a combined capacity of 823 MW. AES Gardabani Holdings BV purchased the 600 MW Gardabani thermal power plant which consists of two 300 MW supercritical gas and oil-fired units that were constructed in 1990. AES Georgia Holdings BV acquired 25-year management contract for Khrami I (113 MW) and II (110 MV) hydroelectric power stations, which have a combined capacity of 223 MW. Approximately one-third of the Gardabani output and the entire output of Khrami I and II will be sold to AES Telasi. AES has paid $6 million in cash - $2.5 million for Khrami I and $3.5 million for Khrami II - for the contracts with a commitment to invest $5 million and $20 million respectively over the next five years. The rehabilitation program of Khrami II, contracted to Ansaldo Energia, is scheduled to be completed in two years. The program, estimated at $23 million, is funded by JBIC. In September 2003, Russian state utility RAO UES signed a 25-year management and lease contract for AO Khramesi. It also acquired the energy distribution company AES Telasi for US$ 23 million. UES also acquired other energy facilities in the republic of Georgia owned by AES: AES Mtkvari, which owns generation unit No. 9 of the Tbilisi TPP. As of 2010, Khrami HPP-1 had an installed capacity of 112.8 MW and Khrami Hpp-2 had an installed capacity of 114.4 MW The project became a full divestiture - see project 6579 Capacity info from InterRao AR http://interrao.ru/en/investors/disclosure/annual/

Original sector

Energy

Location

Country

Georgia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Energy Storage, Hydro, Geothermal, Oil and Gas, Power Generation (CCGT), Power Transmission, Government

Article published date

2024-09-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project