AES Khrami I & II
Sector: Energy Storage • Location: Georgia
Source: World Bank Group
AES singed an agreement in January 2000 to acquire control of three electric generating facilities in the Republic of Georgia with a combined capacity of 823 MW. AES Gardabani Holdings BV purchased the 600 MW Gardabani thermal power plant which consists of two 300 MW supercritical gas and oil-fired units that were constructed in 1990. AES Georgia Holdings BV acquired 25-year management contract fo
- Status
- Closed
- Sector
- Energy Storage, Hydro, Geothermal, Oil and Gas, Power Generation (CCGT), Power Transmission, Government
- Location
- Georgia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about AES Khrami I & II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | cancelled |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | AES singed an agreement in January 2000 to acquire control of three electric generating facilities in the Republic of Georgia with a combined capacity of 823 MW. AES Gardabani Holdings BV purchased the 600 MW Gardabani thermal power plant which consists of two 300 MW supercritical gas and oil-fired units that were constructed in 1990. AES Georgia Holdings BV acquired 25-year management contract for Khrami I (113 MW) and II (110 MV) hydroelectric power stations, which have a combined capacity of 223 MW. Approximately one-third of the Gardabani output and the entire output of Khrami I and II will be sold to AES Telasi. AES has paid $6 million in cash - $2.5 million for Khrami I and $3.5 million for Khrami II - for the contracts with a commitment to invest $5 million and $20 million respectively over the next five years. The rehabilitation program of Khrami II, contracted to Ansaldo Energia, is scheduled to be completed in two years. The program, estimated at $23 million, is funded by JBIC. In September 2003, Russian state utility RAO UES signed a 25-year management and lease contract for AO Khramesi. It also acquired the energy distribution company AES Telasi for US$ 23 million. UES also acquired other energy facilities in the republic of Georgia owned by AES: AES Mtkvari, which owns generation unit No. 9 of the Tbilisi TPP. As of 2010, Khrami HPP-1 had an installed capacity of 112.8 MW and Khrami Hpp-2 had an installed capacity of 114.4 MW The project became a full divestiture - see project 6579 Capacity info from InterRao AR http://interrao.ru/en/investors/disclosure/annual/ |
Original sector | Energy |
Location
Country | Georgia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Hydro, Geothermal, Oil and Gas, Power Generation (CCGT), Power Transmission, Government |
Article published date | 2024-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in Georgia
- United Energy Distribution Company of Georgia (UEDC) and Distribution Company of Adjara (EDCA)
- AES Khrami I & II
- United (Energy) Distribution Company (UDC) Management Contract
- Telasi
- Energy Storage and Green Hydrogen Development Project
- Energy Storage and Green Hydrogen Development Project
- Strengthening Project Development of the Energy Sector (Subproject 3)
- Telasi Distribution Company
