AES Lithium-Ion Battery Grid Project in Atacama Desert
Sector: Solar • Location: Antofagasta, Chile
Source: The Economic Times
A lithium-ion battery project installed by AES in the Atacama Desert near Antofagasta, Chile, which was one of the first lithium-ion batteries tied to an electric grid. The project stores excess power from solar and wind sources and releases energy during peak demand to stabilize the grid and reduce reliance on traditional power plants.
- Status
- Under Construction
- Sector
- Solar, Power Transmission, Energy Storage, Wind, Power Generation (CCGT)
- Location
- Antofagasta, Chile
- Updated
- 22 Jul 2026
- Source
- The Economic Times
ConstructChat
Ask ConstructChat about AES Lithium-Ion Battery Grid Project in Atacama Desert
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | operational |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A lithium-ion battery project installed by AES in the Atacama Desert near Antofagasta, Chile, which was one of the first lithium-ion batteries tied to an electric grid. The project stores excess power from solar and wind sources and releases energy during peak demand to stabilize the grid and reduce reliance on traditional power plants. |
Original sector | Energy |
Location
Country | Chile |
City | Antofagasta |
Source
Source | The Economic Times |
URL |
More Details
Record type | Project |
Sector | Solar, Power Transmission, Energy Storage, Wind, Power Generation (CCGT) |
Article published date | 2025-12-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
