logo

AES Marahu Solar and Battery Storage Project

Sector: Natural Gas • Location: Puerto Rico, United States

Source: Department of Energy (.gov)

Project
Under Construction

The AES Marahu project involves the construction of two solar photovoltaic farms equipped with battery storage and two standalone battery energy storage systems in Puerto Rico. Located in the municipalities of Guayama (Jobos) and Salinas, the project aims to deliver clean, reliable, and affordable power, replacing fossil fuel-based generation and supporting Puerto Rico's clean energy goals.

Status
Under Construction
Sector
Natural Gas, Energy Storage, Power Generation (CCGT), Solar
Location
Puerto Rico, United States of America
Updated
22 Jul 2026
Source
Department of Energy (.gov)

ConstructChat

Ask ConstructChat about AES Marahu Solar and Battery Storage Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “AES Marahu Solar and Battery Storage Project” is an infrastructure initiative in the Natural Gas sector, located in Puerto Rico, United States. Taiyo aggregates data on it from Department of Energy (.gov).

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The AES Marahu project involves the construction of two solar photovoltaic farms equipped with battery storage and two standalone battery energy storage systems in Puerto Rico. Located in the municipalities of Guayama (Jobos) and Salinas, the project aims to deliver clean, reliable, and affordable power, replacing fossil fuel-based generation and supporting Puerto Rico's clean energy goals.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Puerto Rico

Source

Source

Department of Energy (.gov)

URL

More Details

Record type

Project

Sector

Natural Gas, Energy Storage, Power Generation (CCGT), Solar

Article published date

2026-05-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project