Afam Power Project

Sector: Natural Gas • Location: Nigeria

Source: World Bank Group

Project
Active

In December 2001 the Shell Petroleum Development Company of Nigeria (SPDC) won contracts from the National Electric Power Authority (NEPA) to refurbish, operate and transfer the Afam I-IV power plants and to lease operate and transfer the Afam V plant, all located near Port Harcourt. The gas-fired plants were operating below capacity because of poor maintenance, so SPDC was required to refurbish

Project Information FAQ

Project Information

4 Q
The project “Afam Power Project” is an infrastructure initiative in the Natural Gas sector, located in Nigeria. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In December 2001 the Shell Petroleum Development Company of Nigeria (SPDC) won contracts from the National Electric Power Authority (NEPA) to refurbish, operate and transfer the Afam I-IV power plants and to lease operate and transfer the Afam V plant, all located near Port Harcourt. The gas-fired plants were operating below capacity because of poor maintenance, so SPDC was required to refurbish the plants and then operate them for 15 years, selling electricity to NEPA, the national electricity utility. The project was delayed, and final contracts were signed in 2003, with construction to begin in early 2006. The rehabilitation project was expected to increase capacity from 240 MW to 400 MW in the short term, at a cost of US$ 238 million, and eventually to 930 MW by the first quarter of 2007. This was expected to require total investment by SPDC of US$ 540 million. Commercial operation started in 2008. Plant number 5 is said to be converted from Lease operate to own operate. Therefore, the project would be greenfield. This requires checking, because there has not been a written source yet. It is operational as of 2012. In 2013 (http://www.shell.com/global/environment-society/society/nigeria/major-projects/afam.html), Shell shuts down Afam VI due to gas shortage. No change for 2012 updates. http://en.starafrica.com/news/nigerias-afam-power-plant-gets-buyer-for-us260-million.html http://www.ventures-africa.com/2013/07/shell-nigeria-shuts-down-afam-vi-power-plant/ Project initially delayed. Major investment in Dec 2005, with Shell contracting for 200m euro ($237.5 million) to Alstom and Daewoo.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data