logo

AFCC2/RI-Zambezi River Basin Development Project

Sector: Water Supply and Storage • Location: Africa

Source: World Bank

Project
Closed

The development objective of the River Basin Development Project for Zambezi is to advance preparation of the Batoka Gorge hydro-electric scheme (HES) and strengthen cooperative development within the Zambezi river basin. The project comprises of five components. The first component, feasibility studies for the Batoka Gorge HES aims to assess, update, and develop a full bankable feasibility study,

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Hydro, Forest Products and Packaging, Government
Location
Unknown (Sub-Saharan Africa)
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about AFCC2/RI-Zambezi River Basin Development Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “AFCC2/RI-Zambezi River Basin Development Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Africa. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The development objective of the River Basin Development Project for Zambezi is to advance preparation of the Batoka Gorge hydro-electric scheme (HES) and strengthen cooperative development within the Zambezi river basin. The project comprises of five components. The first component, feasibility studies for the Batoka Gorge HES aims to assess, update, and develop a full bankable feasibility study, complete up to tender design, and documentation for the development of Batoka Gorge HES and associated transmission lines to evacuate the power. The second component, environmental and social assessment for the Batoka Gorge HES aims to evaluate the design for the Batoka Gorge HES and develop the required environmental and social impact assessments (ESIAs), along with environmental management plans (EMPs), resettlement policy frameworks (RPFs), and resettlement action plans (RAPs), as needed, for each infrastructure investment associated with the project. The third component, transaction advisory services for the Batoka Gorge HES objective is to provide legal and financial transaction advice to the Zambezi river authority (ZRA) on the development of the Batoka Gorge HES on the Zambezi River. The fourth component, legal and institutional support to the ZRA aims to carry out a program of activities to enhance the legal and institutional framework for the operation and safety of the Kariba hydropower complex, and enhance the recipient's capacity for water resource management and control within the Zambezi river basin. The fifth component, dam break analysis for the Zambezi river basin objective is to support the ZRA enhance the sustainable development and efficient management of the Zambezi river basin through a collaborative exercise with other dam operators in the Zambezi river basin in undertaking a dam break analysis.

Original sector

FY17 - Energy and Extractives,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

Unknown (Sub-Saharan Africa)

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Hydro, Forest Products and Packaging, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project