AFFORESTATION I
Sector: Manufacturing (Industrial) • Location: Mali
Source: World Bank Group
The project would support a five-year program aimed at increasing fuelwood and building pole supplies especially for urban areas, and at strengthening the Forestry Department of the Ministry of Rural Development. The project would (a) establish 3,400 ha of industrial rainfed tree plantations near Bamako; (b) establish on a trial basis 60 ha of rainfed tree plantations near Segou and 70 ha of parti
- Status
- Closed
- Sector
- Manufacturing (Industrial), Raw Materials, Government, Commercial
- Location
- Mali
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about AFFORESTATION I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project would support a five-year program aimed at increasing fuelwood and building pole supplies especially for urban areas, and at strengthening the Forestry Department of the Ministry of Rural Development. The project would (a) establish 3,400 ha of industrial rainfed tree plantations near Bamako; (b) establish on a trial basis 60 ha of rainfed tree plantations near Segou and 70 ha of partially irrigated tree plantations near Mopti; (c) apply modern forest management techniques on a trial basis; (d) establish three rural forestry nurseries and rehabilitate an existing one; and (e) execute studies to investigate more efficient wood uses, to examine possibilities to set up rural forestry activities that would generate participation by the local population and to examine the scope of the follow-up project. |
Original sector | Agriculture, Fishing and Forestry |
Location
Country | Mali |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Raw Materials, Government, Commercial |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
