logo
ProjectActive

Afghanistan Gas Project (AGASP)

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The proposed project is one of three inter-related initiatives aimed at aimed at addressing concerns about the short and long-term sustainability of energy supply in Afghanistan. At present, the country imports over 75 percent (check) of its electricity supply primarily from three neighboring countries (Iran, Turkmenistan and Uzbekistan) and 100 percent of liquid fuels. Electricity supply is vul

Status
Prospective
Sector
Power Generation (CCGT), Oil and Gas, Natural Gas, Commercial, Government
Location
Afghanistan
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Afghanistan Gas Project (AGASP)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Afghanistan Gas Project (AGASP)” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Afghanistan. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project is one of three inter-related initiatives aimed at aimed at addressing concerns about the short and long-term sustainability of energy supply in Afghanistan. At present, the country imports over 75 percent (check) of its electricity supply primarily from three neighboring countries (Iran, Turkmenistan and Uzbekistan) and 100 percent of liquid fuels. Electricity supply is vulnerable to possible abuses of monopoly power by its suppliers, while the supply of other commercial fuels is subject to frequent and unpredictable price fluctuations in the international petroleum market. The problems are compounded by the fact that all of the energy trade is priced in US dollars, which stresses the country’s foreign exchange resources.In order to address these issues, the government is seeking support for three projects: (i) a 40 MW gas-fired IPP at Sheberghan to operate in the short term and be sited near the existing gas fields (the Sheberghan Project), (ii) a 58.6 MW gas-fired IPP to operate over a 20 year time frame located at Mazar e Sherif (the Mazar project), and (iii) improvements in gas infrastructure needed to ensure a sustainable supply of gas to the 2 IPPs in both the short and medium term. The Bank Group would support the first project with an IDA guarantee. The second project would be supported by IDA and MIGA guarantees, and IFC loan, and other risk-mitigating instruments, while the third project would be financed by an IDA (grant/loan). The current document deals in detail with third of these initiatives.AGASP has three components: Component A – Sustaining Gas Supply; Component B - Strengthening Gas Sector Governance; and Component C - Project Management.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Afghanistan

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Oil and Gas, Natural Gas, Commercial, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project