Closed

The development objective of the Regional Eastern Africa Power Pool Project First Adaptable Program Loan (APL1) for Africa is to increase the volume and reduce the cost of electricity supply in Kenya; and to provide revenues to Ethiopia through the export of electricity from Ethiopia to Kenya. There are two components to the project. The first component is construction of a High Voltage Direct Cur

Project Information FAQ

Project Information

5 Q
The project “AFR RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power Integration Program” is an infrastructure initiative in the Road sector, located in Eastern and Southern Africa. Taiyo aggregates data on it from World Bank.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The development objective of the Regional Eastern Africa Power Pool Project First Adaptable Program Loan (APL1) for Africa is to increase the volume and reduce the cost of electricity supply in Kenya; and to provide revenues to Ethiopia through the export of electricity from Ethiopia to Kenya. There are two components to the project. The first component is construction of a High Voltage Direct Current (HVDC) transmission interconnection between Ethiopia and Kenya. This component includes four sub components: 1) transmission line. This sub-component will finance the construction of about 1,045 km of bipolar 500 kV HVDC overhead transmission line to interconnect the electricity network of Ethiopia, at the Wolayta/Sodo substation, with the Kenya network, at the Suswa substation. 2) The second sub-component is converter substations. This sub-component will finance the engineering design, construction, and commissioning of one converter substation on each end one in Ethiopia and one in Kenya - of the transmission line to be constructed under first component of the project, and provision of goods required for such construction and for the maintenance and surveillance of the transmission network, including an helicopter for each country. 3) Environmental and social management. This subcomponent will implement the environmental and social management plans, as defined in the ESIAs, the resettlement policy framework in Ethiopia, and the RAPs. Financing will be made available by the project implementing entities. 4) System reinforcement. The sub-component includes reinforcements in Kenya of the substations and other parts of the network necessary to integrate regional interconnections, while managing the increased demand in Kenya at the commissioning time of the interconnection for reliable operation of the Kenyan grid. The second component is project management and capacity building. This component includes two sub components. The first sub-component is project management and supervision; and the second sub-component is capacity building and technical assistance.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data